9497B-21 C/Ku-Band TVRO
Installation
4-1
4.
Installation
This section contains instructions for unpacking, final assembly and installation of the equipment. It is highly recommended
that final assembly and installation of the Antenna system be performed by trained technicians. Read this complete section
before starting.
4.1.
General Cautions & Warnings
WARNING:
Assure that all nut & bolt assemblies are tightened according the tightening
torque values listed below:
Bolt Size
Inch Pounds
1/4-20
75
5/l6-18
132
3/8-16
236
1/2-13
517
NOTE:
All nuts and bolts should be assembled using the appropriate Loctite thread-locker
product number for the thread size of the hardware.
Loctite # Description
222
Low strength for small fasteners.
243
Medium strength, oil tolerant.
680
High strength for Motor Shafts & Sprockets.
271
Permanent strength for up to 1” diameter fasteners.
290
Wicking, High strength for fasteners which are already assembled.
WARNING:
Hoisting with other than a webbed four-part sling may result in catastrophic
crushing of the radome. Refer to the specifications and drawings for the fully assembled weight
of your model Antenna/Radome and assure that equipment used to lift/hoist this system is
rated accordingly.
CAUTION:
The antenna/radome assembly is very light for its size and is subject to large
swaying motions if hoisted under windy conditions. Always ensure that tag lines, attached to
the radome base frame, are attended while the antenna assembly is being hoisted to its
assigned location aboard ship.
WARNING:
Electrical Hazard – Dangerous AC Voltages exist inside the Antenna Pedestal
Breaker Box. Observe proper safety precautions when working inside the Pedestal Breaker Box.
WARNING:
Electrical Hazard – Dangerous AC Voltages exists on the side of the Antenna
Pedestal Power Supply. Observe proper safety precautions when working inside the Pedestal
Power Supply.
Содержание 9497B-21
Страница 3: ......
Страница 4: ...iv Revision History REV ECO Date Description By A N A August 17 2010 Initial Production Release MDN ...
Страница 40: ...Setup 9497B 21 C Ku Band TVRO 5 4 This Page Intentionally Left Blank ...
Страница 70: ...Maintenance and Troubleshooting 9497B 21 C Ku Band TVRO 7 28 This Page Intentionally Left Blank ...
Страница 76: ...9497B 21 Technical Specifications 9497B 21 C Ku Band TVRO 8 6 This Page Intentionally Left Blank ...
Страница 78: ...Model 9497B 21 Drawings 9497B 21 C Ku Band TVRO 9 2 This Page Intentionally Left Blank ...
Страница 80: ......
Страница 83: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 97: ......
Страница 98: ......
Страница 102: ......