9497B-21 C/Ku-Band TVRO
Installation
4-15
4.5.7.
Refer to the Radome Assembly drawing for your system and the procedure below.
Close the 144” Radome Assembly
1.
Lift Upper section up over the dish &
feed assembly and set it down onto
the lower section.
2.
Set the upper section onto the top of
the lower panels.
3.
Loosely attach the upper panels to the
lower panels using the hardware
provided. Do NOT tighten the bolts at
this time.
Содержание 9497B-21
Страница 3: ......
Страница 4: ...iv Revision History REV ECO Date Description By A N A August 17 2010 Initial Production Release MDN ...
Страница 40: ...Setup 9497B 21 C Ku Band TVRO 5 4 This Page Intentionally Left Blank ...
Страница 70: ...Maintenance and Troubleshooting 9497B 21 C Ku Band TVRO 7 28 This Page Intentionally Left Blank ...
Страница 76: ...9497B 21 Technical Specifications 9497B 21 C Ku Band TVRO 8 6 This Page Intentionally Left Blank ...
Страница 78: ...Model 9497B 21 Drawings 9497B 21 C Ku Band TVRO 9 2 This Page Intentionally Left Blank ...
Страница 80: ......
Страница 83: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 97: ......
Страница 98: ......
Страница 102: ......