background image

SERVICE DIAGNOSIS: Condition - No Ice Being Produced

STATUS: 

NOTHING OPERATES

A. Check: Voltage to the unit, restore it if there is none. Compare to the nameplate.

B. Check: The master switch, switch ON if off.

C. Check: The 2 reset switches (spout switch and high pressure): depress and release each
switch. If the unit still does not start, check the spout switch, or high side pressure.

D. Check the high pressure cut out switch.

1. This pressure switch opens at 400 psig. Check the high side pressure, reset the switch and
observe that the fan is forcing air through the condenser. If the switch opens at pressures below
400 psig, replace the switch. If the pressures rise above the trip out point, and the unit shuts down:

a. Check for adequate air flow. Clean the condenser. If the air flow is poor because of the
installation, advise the user that the unit should be moved, or the air around it kept cooler.

Check the fan motor for tight bearings and proper rotation. 
Check that the fan blades are clean, and the fan secure to the fan motor shaft.

b. Check the head pressure control valve, it should be maintaining a head pressure 
above 220 psig. If the unit has the correct charge, and the condenser is clean, and the 
refrigerant lines are not kinked or twisted, and the condenser is not overheated by 
external heat loads, the head pressure should be under the trip out point of the head
pressure control switch. If all of the above are found to be good, and the machine
trips out on high head pressure, replace the head pressure control valve.

E. Check the spout switch

1. This switch will open if the bin control (ice level sensor) does not shut the machine off when the

ice storage bin is full of ice: ice backs up in the ice chute, and internal pressure opens the switch,
stopping the machine. After the ice melts, the switch needs to be reset. If the machine does start,
check:

a. The ice level sensors, they may need cleaning (see maintenance).
b. The circuit board, see next page.

F. Check the water level. If there is not enough water in the reservoir, the water level sensor will
keep the machine from starting.

a. Check the water level, restore/adjust if low.
b. Check the water level sensor, clean if dirty, (see maintenance).
c. Check the circuit board, see next page.

If the machine does not start, see the next page.

NM950R

May, 1989

Page 26

Содержание NM950R

Страница 1: ...ectronic circuit for monitoring ice and water level a thermostatic expansion valve and R 502 as the refrigerant TABLE OF CONTENTS For the Installer Specifications 2 Location 5 Remote Condenser 6 For t...

Страница 2: ...ndenser Junction Box Electrical Inlet Water Inlet 3 8 Flare Drain 3 4 FPT 2 96 3 5 25 20 84 Allow 6 above machine for service Minimum Circuit Ampacity is used to determine wire size and type per Natio...

Страница 3: ...s are designed and manufactured with the highest regard for safety and performance They meet or exceed the standards of UL NSF and CSA Scotsman assumes no liability or responsibility of any kind for p...

Страница 4: ...ine set 40 R 502 KCMR230 Fan Relay Kit used when two 230 volt 32 icemakers are on one 230 volt 32 two circuit condenser DIMENSIONS H X W X D MODEL USE WITH MINIMUM CIRC AMPACITY BASIC ELECTRICAL RC105...

Страница 5: ...eveling later Return the bin to the upright position remove paper covering the bin gasket Install the bin top according to the directions with the bin top Note Do not push bin into position but lift i...

Страница 6: ...tions 1 Each set of precharged refrigerant lines either 25 foot or 40 foot consists of a 3 8 inch diameter liquid line and a 1 2 inch diameter discharge line Both ends of each line have quick connect...

Страница 7: ...a definite increase in resistance is felt 4 Using a marker or pen mark a line lengthwise from the coupling union nut to the bulkhead Then tighten the coupling and additional 1 4 turn As the nut turns...

Страница 8: ...INSTALLER Location TWO UNITS ON ONE CONDENSER REMOTE CONDENSER EXCESS PRECHARGED TUBING INSIDE BUILDING ICEMAKERS SERVICE ACCESS SERVICE ACCESS SIDE AND BACK ROOF CUTAWAY WALL CUTAWAY NM950R May 1989...

Страница 9: ...the gravity type and 1 4 inch per foot fall is an acceptable pitch for the drain tubing There should be a vent at the highest point of the drain line and the ideal drain receptacle would be a trapped...

Страница 10: ...r the compressor and the fan motor operates whenever the compressor operates Electrical connections are made at the junction box at the back of the icemaker and at the junction box on the remote conde...

Страница 11: ...will be required 1 Mount the control box in a convenient location 2 Attach a solid earth ground wire to the ground screw 3 Route connecting wires from the first ice maker junction box marked condense...

Страница 12: ...his after start up 2 Test with a volt meter between terminals 2 and 4 then between terminals 1 and 3 Compare the readings obtained to the ones in the following list C Test terminals 1 2 Full Voltage 2...

Страница 13: ...INSULATED PRECHARGED REFRIGERANT TUBING A typical installation should generally appear as illustrated below The remote condenser must be located above the icemaker and the precharged lines installed...

Страница 14: ...of 20 psig 7 Has the machine been secured to the bin 8 If two units on one condenser has the relay kit been installed 9 Is there a water shut off valve installed near the machine 10 Is the remote con...

Страница 15: ...e electrical start up sequence is now on automatic A There should be a short 15 second delay before the gearmotor starts B After the gearmotor starts the liquid line valve will open the low pressure c...

Страница 16: ...l shut the machine off it there is none Ice Discharge Chute Directs the ice produced by the evaporator into the storage bin Ice Level Sensor An electronic eye it senses the presence of ice in the bott...

Страница 17: ...cuit board Pump Down Control An automatic reset pressure switch connected to the low side of the refrigeration system Controls the compressor Potential Relay The compressor start relay On Off Switch M...

Страница 18: ...e auger motor is run by the circuit board for 2 5 more minutes clearing out ice in the evaporator and then The auger motor relay opens and the auger motor stops If the ice level sensor is clear bin em...

Страница 19: ...r which it enters through the float valve The water them goes out the bottom of the reservoir tank to the bottom of the evaporator Reservoir overflow or evaporator condensation is routed to the drain...

Страница 20: ...ding upon the temperature of the evaporator warmer evaporators get more refrigerant and colder evaporators get less At the evaporator the refrigerant enters an area of relatively low pressure where it...

Страница 21: ...refrigerant into the condenser with a small amount of discharge gas going into the receiver to maintain pressure until the head pressure is built back up to the rated gauge pressure of 220 psig At tha...

Страница 22: ...At this point the refrigerant flow is stopped by the closed liquid line valve This action forces the refrigerant into the receiver and keeps it out of the compressor The pump down continues until the...

Страница 23: ...ic and Hydroxyacetic acids These compounds are corrosive and may cause burns If swallowed DO NOT induce vomiting Give large amounts of water or milk Call Physician immediately In case of external cont...

Страница 24: ...he top bearing in the breaker should also be checked at least two times per year Check the breaker bearing by removing the ice chute cover unscrewing the ice sweep removing the water shed using a span...

Страница 25: ...lacement of these parts see REMOVAL AND REPLACEMENT Shut off the water supply 1 To remove the auger remove the front and top panels 2 Remove 3 hex studs holding ice chute cover to ice chute and remove...

Страница 26: ...ure control valve it should be maintaining a head pressure above 220 psig If the unit has the correct charge and the condenser is clean and the refrigerant lines are not kinked or twisted and the cond...

Страница 27: ...hould be ON if not replace the circuit board If the bin full light on the tester is ON move the tester switch to bin empty the light on the tester should go OFF and the bin empty light on the circuit...

Страница 28: ...move the gearbox and Check for internal damage repair and replace in the machine b Check for low charge add some refrigerant if the unit begins to operate normal low side pressure being about 30 psig...

Страница 29: ...be restricted defective or not adjusted properly If needed replace the TXV evacuate and recharge per nameplate 4 Check the insulation on the evaporator It should be dry with no wet spots or frost If...

Страница 30: ...cemaker 8 Reverse to reassemble BIN CONTROLS Ice Level Sensors 1 Disconnect electrical power 2 Remove front panel 3 Remove control box cover 4 Locate ice chute at the base of the chute in front of and...

Страница 31: ...ews holding breaker to evaporator d Lift up and remove breaker bearing assembly from auger evaporator 6 Service the bearing Check for rust rough spots and damage a The bearing is pressed into the brea...

Страница 32: ...nscrew auger stud from top of auger c Unscrew 4 allen head cap screws holding breaker to evaporator d Lift up on breaker to remove from auger If the auger is stuck Use a slide hammer type puller to pu...

Страница 33: ...place the snap ring and pull the water seal down against it 3 The part of the water seal that rotates with the auger must also be replaced Remove the old part from the auger and clean the mounting are...

Страница 34: ...ase cover is in place between the gearcase cover and the drip pan gasket Torque the bolts to 110 inch pounds 2 Lower the auger into the evaporator barrel slightly turning it to match up with the drive...

Страница 35: ...GEAR OUTPUT SHAFT AND BEARINGS GASKET GEARCASE DRIVE MOTOR BEARING SEAL WATER SHED SEAL REMOVAL AND REPLACEMENT Gearmotor Assembly WARNING Disconnect Electrical Power Before Begining NM950R May 1989 P...

Страница 36: ...rfill Note The gears and bearings are available only as pressed together sets D After replacing parts as required if any reassemble the gearcase The two smaller gears and the oil should be in the lowe...

Страница 37: ...f while inspection shows that the ice level sensors are properly aligned clean and not obstructed use the tester as follows Bin Control Note All testing is done with the electrical power on the master...

Страница 38: ...board should go ON If not replace the circuit board b Move the water switch on the tester to the Water position The No Water light on the board should go OFF If not replace the circuit board If the li...

Отзывы: