CS55: INSTALLATION
FINAL CHECK
1. Is the Cabinet level?
2. Have all the electrical and piping
connections been made?
3. Has the voltage been tested and
checked against the nameplate rating?
4. Is the unit plugged into a separate
electrical circuit?
5. Is the water supply line shut off valve
installed and is the water turned on?
6. Have the bin interior, and the cabinet
exterior been wiped clean?
7. Are all internal parts in place, including
the spray platform and curtain?
8. Have the internal refrigerant lines been
checked for rubbing and chaffing?
9. Has the machine been installed where it
is indoors, in a controlled environment, with
adequate air circulation around the
machine, and where it can be serviced?