Ice Making Section Set Up
Rotate the ice making section as needed to access
theleft side, where the refrigeration connections will
be made. Connect the suction line to the top fitting.
Connect the vapor line to the middle fitting.
Connect the liquid line to the bottom fitting.
See Coupling Connections on the next page for
detailed instructions.
After couplings are connected, add cork-tape type
insulation to exposed fittings to reduce
condensation potential.
Eclipse
ä
2000
April 2002
Page 23
Refrigerant Lines, Shown Routed Out The Top
Add
insulation
Suction
Vapor
Liquid
Refrigerant Lines, Shown Routed Out the Back