Ice Making Section Set Up
Rotate the ice making section as needed to access
the left side, where the refrigeration connections
will be made. Connect the suction line to the top
fitting. Connect the vapor line to the middle fitting.
Connect the liquid line to the bottom fitting.
See Coupling Connections on the next page for
detailed instructions.
After couplings are connected, add cork-tape type
insulation to exposed fittings to reduce
condensation potential.
Eclipse
ä
1300,1600
September 2003
Page 23
Refrigerant Lines, Shown Routed Out The Top
Add
insulation
Suction
Vapor
Liquid
Refrigerant Lines, Shown Routed Out the Back