SCOTLE Scotle-HR460C Скачать руководство пользователя страница 27

  

   

Shenzhen SCOTLE Technology

 

----------------------------------------------------------------------- 

Email:[email protected]    Tel:86075589378931   

http://www.scotle.com/

 

------------------------------------------------------------------------------------------------ 

automatic status. When the temperature is about to run out, the machine 
will buzz automatically,    now use the vacuum suction pen to remove away 
the BGA chip quickly,    then move the PCBA board from the fixture. 
 

4.

 

When  do  soldering ,  adjust  the  cooling  fan  to  automatic status  and 
turn  off  the  vacuum  suction  system,  and  the  temperature  is  about  to 
running out, the machine will buzz to alarm, and the cooling fan begin to 
cool the BGA and PCB board, and the hot air nozzles blow cold wind now. 
Move th e top  h eater  up  to  mak e sur e th e ho t air  nozzl e is 3 -5mm 
away from th e BGA  surfac e and  after getting  cooling for 30 to 40 
seconds,  or  th e  Start  bu tton  indicator  off,  move  the  PCB  bo ard 
away  from the fixture.    
 

5.

 

Before soldering the BGA, make sure the PCB pads and 

BGA solder balls

 are 

100% ok. After place the BGA , we should do  cosmetic examine. If they 
looks  not  ok,  do  not  do  soldering  to  avoid  damaging  the  BGA  and  PCB 
boards. 
 

6.

 

The  BGA  rework  station  surface  need  to  be  cleaned  often,  especially  the 
infrared  area.  Because  residue  on  the  area  will  affect  the  normal  heating 
distribute and reduce the use life of heating. 

 
Web: 

www.scotle.com

 

Mail: 

[email protected]

 

Tel:    86075589378931 
 
 
 

 

 

Содержание Scotle-HR460C

Страница 1: ...http www scotle com SCOTLE BGA Rework Station Model Scotle HR460C Scotle HR460C BGA rework station power requirement Use a smaller power supply voltage fluctuation Voltage fluctuations 220V 10 Freque...

Страница 2: ...le Adjust the upper zone of before and after position Rotating the handle 4 7 handle lock the rotation angle of the upper zone Rotating the handle 5 Head light Lighting equipment at work Press the but...

Страница 3: ...zone BGA rework with warm up 17 Temperature Interface Connect an external galvanic measure the actual temperature Directly connect temperature line 18 Touch screen Data storage system platform Scotle...

Страница 4: ...igh precise K type closed loop control and automatic temperature adjustment system Together with PLC and temperature module users can control the temperature efficiently and can keep the temperature d...

Страница 5: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com...

Страница 6: ...l 86075589378931 http www scotle com 6 Scotle HR460C uses movable and retractable universal fixture which can protect PCBA from deformation and avoid damaging the surrounding components from And it is...

Страница 7: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com...

Страница 8: ...is equipped with different kinds of alloy air nozzles which can be rotate in 360 degrees for easy positioning and they can be installed and replaced easily 8 Scotle HR460C has three independent temper...

Страница 9: ...the touch screen 11 Scotle HR460C applies high power cross flow fan cooling system uses which can cooling the PCB quickly to avoid deformation Scotle HR460C is with built in vacuum pump and external v...

Страница 10: ...hen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 14 Scotle HR460C is equipped with emergency stop button and automatic power off device which can make sure safety wo...

Страница 11: ...LE Technology Email sales scotle com Tel 86075589378931 http www scotle com 15 Scotle HR460C use drawer design repair window if users need to check or repair the machine just draw the repair panel out...

Страница 12: ...ell ventilated dry place 4 Stable flat areas less susceptible to vibration 5 Clean with less dust room 6 No placing heavy objects on top of the control box 7 Without the affect of air conditioners hea...

Страница 13: ...t 8 If the metal objects or liquids fall into the repair station when it works immediately disconnect the power unplug the power cord until the machine to cool down then completely remove litter dirt...

Страница 14: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 2 The touch screen shows interface as below you can select your target language...

Страница 15: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com...

Страница 16: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 3 Choose English turn up below interface...

Страница 17: ...Shenzhen SCOTLE Technology Email sales scotle com Tel 86075589378931 http www scotle com 4 After input password below interface shows...

Страница 18: ...ature zones can be set 6 ramp up temperature segments and 6 constant temperature segments You can certify the temperature parameters in the current interface and it only can be run one time after you...

Страница 19: ...com Tel 86075589378931 http www scotle com 7 Users can certify and save the parameters according to their own different needs SCOLTE HR460C can store massive profiles and users can select any one to...

Страница 20: ...com How to select profile Click to enter into below interface Touch to enter below interface and select the temperature number then to finish the selection to main interface to and run the selected pr...

Страница 21: ...ttp www scotle com You can change the current parameters to your own setting as below After certify the parameter touch After certifying all the parameters of the three temperature zones then to store...

Страница 22: ...g the top target parameters are all ran or the top ramp up slope is 0 then the heating process is finished and the machine stop running and begin buzzle If the cooling system and vacuum system already...

Страница 23: ...more than 300 degrees the machine will stop heating immediately 12 The rework system can automatically set the alarming time in advance If set 10s the machine will buzz 10s before the heating process...

Страница 24: ...90 215 225 230 0 Constant time 30 30 35 40 70 0 IR pre heater 110 120 130 140 150 0 Constant time 30 30 35 40 70 0 Slope rate 2 2 2 2 2 0 Preheating Constant Ramp up Soldering 1 Soldering 2 Cooling Up...

Страница 25: ...t time 30 30 35 40 70 0 Slope rate 2 2 2 2 2 0 Preheating Constant Ramp up Soldering 1 Soldering 2 Cooling Up heater 165 190 225 245 255 240 Constant time 30 30 35 55 25 15 Bottom heater 165 190 225 2...

Страница 26: ...ature profile The maximum of each temperature segment cannot exceed 300 If it is lead free soldering users can set temperature profile according to the BGA solder ball soldering temperature 3 When to...

Страница 27: ...d and the hot air nozzles blow cold wind now Move the top heater up to make sure the hot air nozzle is 3 5mm away from the BGA surface and after getting cooling for 30 to 40 seconds or the Start butto...

Отзывы: