4
1.2 Primary Structure
Metal Module
Display
Operation Panel
Power Switch
Power Input Socket
Страница 1: ...1 Operation Manual for Mycotoxin LFD Incubator CUSFY 1...
Страница 2: ...stallation 5 2 Technical Parameter 6 3 Safety Warning 6 4 Operation Procedure 7 4 1 Set up a new Procedure 7 4 2 Set S N of Procedure 7 4 3 Set Temperature 7 4 4 Set Time 7 4 5 Set Time Unit 8 4 6 Pro...
Страница 3: ...oods and contact us immediately if you found any parts mismatched missing or damaged 1 Introduction Incubator is new product controlled by microcomputer It is widely used for sample preservation and r...
Страница 4: ...4 1 2 Primary Structure Metal Module Display Operation Panel Power Switch Power Input Socket...
Страница 5: ...r input socket then connect the other end of power adapter with power grid between 100V and 240V Check below chart 1 3 3 Power switch on and then it will reach to setting temperature Basically it take...
Страница 6: ...y 0 1 Heating up Time from 40 to 100 20min Environment Temperature 5 35 Overall Dimension W D H 110mm 148mm 120mm Net Weight 0 5 kg 3 Safety Warning It is used indoor It might cause personal injury if...
Страница 7: ...em comes to operation interface Press Start Stop key over 2 minutes then is goes into Setting up Procedure interface You can DIY 9 procedures P1 to P9 Each procedure includes 3 sections move A B C 28...
Страница 8: ...o A Stop key 4 6 6 It will send warning tone at one minute at a time and also display FINISHED after running complete procedure Meanwhile it will remain at current temperature Please turn off the powe...
Страница 9: ...will exit current menu without saving configuration information 4 7 2 Automatic recovery after power failure ORF Enable ORF it will get back to the procedure run before power failure once when power o...
Страница 10: ...ntact us Module did not heat up Heater malfunction Contact us Key malfunction Broken membrane switch Contact us Regularly clean longhole on module with clean soft cloth that takes a little absolute al...