![SCHUNK WBL 85 Balfour Beatty Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/schunk/wbl-85-balfour-beatty/wbl-85-balfour-beatty_maintenance-and-operating-manual_1215849021.webp)
9.4
Repairs of Component Parts
9.4.1
Free Bearing of Base Frame and Upper Frame
Instructions:
❑
Remove both cover plates (1) (e.g. using a screwdriver).
❑
Push bearing housing (5) out of bearing block by means of a sleeve, which only
rests on the outer ring of the grooved ball bearing.
❑
Detach both retaining rings (4) with retaining ring pliers.
❑
Push bearing shaft (2) out of grooved ball bearing (3), clean, check for
movebility and bearing play, and replace if necessary.
❑
Assembly of bearings vice versa - pack space between grooved ball bearings
with grease TOP 2000 of AGIP Schmiertechnik.
Cover Plate (1)
Grease TOP 2000 of AGIP Schmiertechnik
Bearing Housing (5)
Retaining Ring (4)
Grooved Ball Bearing (3)
Bearing Shaft (2)
WBL 85-15kV
Repairs
Single Arm Pantograph WBL 85 Balfour Beatty
Page 21
Содержание WBL 85 Balfour Beatty
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 56: ......