![SCHUNK VERO-S NST3 400-250 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/schunk/vero-s-nst3-400-250/vero-s-nst3-400-250_assembly-and-operating-manual_1215848021.webp)
Assembly
Connecting hose lines
Choosing the minimum cross section for the hose line depends on
the number of quick-change pallet modules installed inside one
clamping station or in several clamping stations actuated with
shared hose lines. Then, supply lines with the following minimum
cross sections must be used.
Number of clamping modules
installed
min. nominal hose width (hose
inner diameter)
4
6 mm
8
8 mm
When decoupling hose lines, the pneumatic plug-in connection or
the sealing nipple must be protected against the ingress of dirt or
coolant. The sealing nipple comes with a plastic cover plug.
4.3.1 NST3 400-250
Depending on the design of the machine table, the clamping
station is mounted on the machine table with screws size M12 or
M16 according to DIN EN ISO 47 10.9. The permissible drilling
ranges for individually drilled holes can be found in the drilling
drawings. There are two alignment grooves on the bottom of the
clamping station for mounting loose T-nuts to be used for aligning
the clamping stations. These allow for precise alignment along an
alignment groove. Alignment to the machine table is also possible
by installing a centering pin and an alignment pin. The NST3
400-250 has two G 1/8" connections for separate functions. One
air connection for unlocking and one air connection for the turbo
function. Supply is via the sealing nipple for locking couplings type
NW 7.4 (accessory). The clamping station can be retrofitted to the
supply points at both air connections with a separately available
connecting strip (accessory).
21
02.00 | NST3 | VERO-S quick-change pallet system | en | 1344366
Содержание VERO-S NST3 400-250
Страница 43: ......