Assembly
03.00|1152197 NSE3, NSE-T3 |en
41
Dyna mic pressure NSE3 138 / NSE3 138-K / NSE3 138-V1 / NSE3 138-V1-K / NSE3 138-P / NSE3 138-P-K
*
NSE3 138, NSE3 138-V1,
NSE3 138-V4, NSE3 138-P
Rework on the plug required
*
NSE3 138-K, NSE3 138-V1-K,
NSE3 138-V4-K, NSE3 138-P-
K
M7 connection thread
integrated
NOTICE
If the pneumatic monitoring function for monitoring the
clamping slide position is not used, it must be ensured that the
quick-change pallet systems can be loaded or unloaded without
being damaged.
•
Before loading or unloading the clamping pallet
it must be
ensured that all integrated clamping modules are unlocked.
•
Before beginning the machining process
it must be ensured
that the integrated clamping modules are locked, and that the
clamping pallet is placed flat on the locating surface.
Содержание VERO-S NSE-T3 138
Страница 30: ...Assembly 30 03 00 1152197 NSE3 NSE T3 en...
Страница 33: ...Assembly 03 00 1152197 NSE3 NSE T3 en 33...
Страница 39: ...Assembly 03 00 1152197 NSE3 NSE T3 en 39 Usage arrangement of the different types of clamping pins...
Страница 55: ...Assembly Drawings 03 00 1152197 NSE3 NSE T3 en 55 Assembly Drawings NSE3 138 assembly 10 10 1...
Страница 56: ...Assembly Drawings 56 03 00 1152197 NSE3 NSE T3 en NSE T3 138 assembly 10 2...
Страница 57: ...Assembly Drawings 03 00 1152197 NSE3 NSE T3 en 57 Cone seal KVS3 138 10 3...