Schmidt
Mess- und Regeltechnik
©2013 Schmidt
Mess- und Regeltechnik
Fon 0 67 32 - 91 91 20 Fax 0 67 32 - 96 24 42 [email protected]
2
Operation Manual Flow Transmitter DW-D
2.3
Items with WELDED SOCKET
The welding socket is included in the delivery. Remove by loosening union nut (A). The
dimensions shown in the drawing (right) must be adhered to strictly to. Drill a ridge less hole in
the pipe. Weld the socket to the pipe. Mount the flow transmitter to the socket ensuring that
the pendulum is not damaged during this procedure. Align the transmitter into the final desired
position before tightening the union nut (A). Please do not forget to keep the flow direction in
consideration before weld on the socket. (groove)
2.4
Torsional moment of the union nut
If the device shall be divided from the t-piece or the welding socket, the union nut has to be
disconnected and the device carefully taken out of the housing.
If both pieces are assembled, please take care that the nut is tightened with a torsional
moment of 40Nm.