![Schmeiser 3-Point Hitch Category 1 & 2 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/schmeiser/3-point-hitch-category-1-and-2/3-point-hitch-category-1-and-2_operation-and-parts-manual_1213004017.webp)
Till An’ Pak™
Ph. (559) 268-8128
17
www.tgschmeiser.com
Fax (559) 268-3279
Lubrication Points
Bearings come pre-lubed from the factory. Prior to
applying grease, allow 40 hours of operation time to
break in the seals. Add grease to the zerk fitting on the
pillow block bearings on roller models, as shown. Avoid
mixing different brands of grease.
Note:
Clean the fitting, then add grease until it is visibly
forced out of the bearing.
Ground Engaging Components
Ground engaging components are subject to abrasion
and wear. Excessively worn roller rings will require
replacement.
Storage Preparation
After work is completed for a season, perform the
following maintenance procedures before storing the
implement.
1. Apply a thin layer of grease or rust preventative to all
exposed metal surfaces of the adjustable
mechanisms (threaded rods, etc.).
2. Check all bolted connections. Ensure that the
fasteners are tight, and all retaining pins are secured
in place with appropriate retaining clips.
3. Inspect the frame for structural fractures.
4. Check roller rings for wear and damage. If
excessively worn or damaged, they must be replaced.
5. Make sure all the warning decals are in place and
legible. Replace any worn decals as needed.
6. Thoroughly wash the Till An’ Pak with a pressure
washer or water hose to remove all dirt, mud, or
debris.
7. Drain water from the roller tube (if applicable).
8. Lubricate the grease fittings on the roller pillow block
bearings with a good general purpose lithium grease.
Refer to “Lubrication Points” on page 17 for the
location of the fittings.
9. To help prevent corrosion, remove rust and apply a
coat of paint to frame surfaces where paint has been
worn off or damaged.
10. Make sure the implement is stored in an area with a
firm and level base to prevent it from tipping or
sinking into the ground. For best results, always
store the Till An’ Pak in a dry, protected location.
Leaving this implement unprotected will shorten the
service life.
Placing In Storage
1. Select an area that is dry, level, and free of debris
(inside a building is ideal). Move the Till An’ Pak to its
storage area.
2. Disconnect the Till An’ Pak from the tractor and drive
the tractor away from the implement. Do not leave the
tractor attached to the Till An’ Pak.
Removing From Storage
Prior to use each season, perform the following
inspection and maintenance.
1. Read the operator’s manual to review all safety,
operational, and maintenance procedures.
2. Perform any recommended maintenance that was not
completed when the implement was put into storage.
3. Visually inspect the implement for wear or damage.
4. Make sure all the warning decals are in place and
legible. Replace any damaged or missing decals.
5. Attach the Till An’ Pak to the tractor. Refer to “Attaching
to Tractor” on page 14.
STORAGE
Содержание 3-Point Hitch Category 1 & 2
Страница 2: ...Copyright 2019 T G Schmeiser Co Inc All rights reserved...
Страница 5: ...Till An Pak Ph 559 268 8128 5 www tgschmeiser com Fax 559 268 3279 TILL AN PAK AND ACCESSORIES...
Страница 26: ...Till An Pak www tgschmeiser com 26 Ph 559 268 8128 Fax 559 268 3279 NOTES...
Страница 27: ...Till An Pak Ph 559 268 8128 27 www tgschmeiser com Fax 559 268 3279 NOTES...
Страница 28: ...Till An Pak www tgschmeiser com 28 Ph 559 268 8128 Fax 559 268 3279 Version 2 0 July 2019...