![Schmeiser 3-Point Hitch Category 1 & 2 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/schmeiser/3-point-hitch-category-1-and-2/3-point-hitch-category-1-and-2_operation-and-parts-manual_1213004014.webp)
Till An’ Pak™
www.tgschmeiser.com
14
Ph. (559) 268-8128
Fax (559) 268-3279
OPERATION
Attaching to Tractor
Use caution when connecting the Till An’ Pak to the
tractor. The Till An’ Pak should be securely resting on the
ground. Keep hands and feet from under the implement
and clear of pinch points between the tractor drawbar
and implement hitch.
WARNING
Understand Safety Procedures!
Read and understand all safety procedures
described in this manual before performing any work
on or around the implement.
Initial Setup Checklist
Efficient and safe operation of the Till An’ Pak
requires that every user read and understand the
operational instructions and all related safety instructions
outlined in this manual.
This checklist is provided for the user/owner. It is
important for both personal safety and to maintain the
mechanical condition of the Till An’ Pak that this
checklist is followed.
Check the condition of the
roller rings. Refer to “Ground
Engaging Components” on
page 17. Replace if necessary.
Make sure all hardware is
properly installed and
tightened. Refer to
“Maintenance Schedule” on
page 16.
Make sure the Till An’ Pak is
properly mounted to tractor
hitch. Refer to “Attaching to
Tractor” on page 14.
Initial Setup Checklist
(prior to using for the first time)
Location
Task
Implement Break-In
Although there are no operational restrictions on
the Till An’ Pak when used for the first time, it is
recommended that the following mechanical items be
checked:
1. After 1/2 hour of operation:
a. Check all fasteners and tighten if necessary.
b. Make sure that the roller rings are in good
condition.
2. After 10 hours of operation:
a. Go to the normal servicing and maintenance
schedule, as defined in the Maintenance
Section.
General Operating Instructions
1. Familiarize yourself with the Operation and Parts
Manual, and make sure the Till An’ Pak is properly
attached to the tractor before beginning work. Inspect
the condition of the cutting edges and the overall Till
An’ Pak for potential problems or damage. Do not use
the implement if it needs repairs of any type.
2. Clear the area of bystanders, especially small
children. Make sure that you can clearly see and
identify passersby, steep slopes, ditches, drop-offs,
power lines, debris, and foreign objects. If you are
unable to clearly see these type of items, discontinue
operating the Till An’ Pak.
3. Know the location of all underground cables,
pipelines, and other hazards in the area. Also make
certain that all irrigation heads, utility outlets, and
other obstacles are properly marked.
4. Watch for low hanging limbs, power lines, and other
overhead obstacles while you are operating. Use
care to avoid hitting these items.
5. Do not operate the Till An’ Pak, or drive the tractor into
material that is burning, or areas that recently burnt
and may contain hot spots. Tire damage can occur
when driving over hot material. Oil and grease on the
tractor and Till An’ Pak could ignite, resulting in
equipment destruction.
6. Lower the Till An’ Pak to the ground and proceed
forward at a speed of no more than 2 to 4 MPH. The
Till An’ Pak should immediately begin working soil
surface.
Содержание 3-Point Hitch Category 1 & 2
Страница 2: ...Copyright 2019 T G Schmeiser Co Inc All rights reserved...
Страница 5: ...Till An Pak Ph 559 268 8128 5 www tgschmeiser com Fax 559 268 3279 TILL AN PAK AND ACCESSORIES...
Страница 26: ...Till An Pak www tgschmeiser com 26 Ph 559 268 8128 Fax 559 268 3279 NOTES...
Страница 27: ...Till An Pak Ph 559 268 8128 27 www tgschmeiser com Fax 559 268 3279 NOTES...
Страница 28: ...Till An Pak www tgschmeiser com 28 Ph 559 268 8128 Fax 559 268 3279 Version 2 0 July 2019...