2. Site Assessment
A pre-installation site assessment is highly recommended when planning and designing a Diver-NETZ installation
(for both the Mobile and Static solution) at a specific site as external and/or environmental factors can influence
the proper functioning of Diver-NETZ. A site assessment can determine the performance level of the Diver-NETZ
system and ensure that the solution will meet all predetermined requirements.
The site assessment should include but is not limited to the following:
•
Physical verification of all planned equipment locations;
•
Review of mounting options and possible required alterations to existing locations;
•
Assessment of interfering and operating frequencies currently in use or ambient in the environment;
•
Analysis of Diver-DXT radio signal propagation. The radio coverage is dependent on the well setup and
environmental conditions;
•
Analysis of GSM/GPRS coverage (only for Static solution);
•
Evaluation of various antenna choices to optimize performance (only for Static solution).
During the site assessment a complete set of Diver-NETZ equipment can be physically brought to the field for
testing purposes. Additionally, other tools (such as a GSM/GPRS signal analyzer) can also be used during the site
assessment.
Содержание Diver-NETZ
Страница 27: ...February 2014 www swstechnology com copyright of SLB Appendix I ...
Страница 34: ...February 2014 www swstechnology com copyright of SLB Appendix II ...
Страница 36: ...February 2014 www swstechnology com copyright of SLB Appendix III ...
Страница 39: ...February 2014 www swstechnology com copyright of SLB Appendix IV ...
Страница 41: ...February 2014 www swstechnology com copyright of SLB Appendix V ...
Страница 43: ...February 2014 www swstechnology com copyright of SLB Appendix VI ...
Страница 46: ...February 2014 www swstechnology com copyright of SLB Appendix VII ...
Страница 48: ...February 2014 www swstechnology com copyright of SLB Appendix VIII ...