![Schletter FixGrid18-100 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/schletter/fixgrid18-100/fixgrid18-100_mounting-instructions_1212726009.webp)
If the ballast trays are filled with gravel, the gravel can be prevented from leaking
at the row ends by folding up the tray ends.
To do so, the ends of the ballast trays have to be folded at the perforation.
The first ballast tray is laid from the right with the recesses
and the upstand on the base rails.
All other trays are turned 180 degrees (recesses on the left) from right to left. The
tray always lies with the side of the slots at the bottom and in the base rail with a
positive fit.
At the last ballast tray, the end has to be unfolded again.
Further Information about our systems can be found on our website:
www.schletter-group.com in the solar section under
Downloads
.
LAY THE BALLAST WITH
ADDITIONAL BALLAST TRAYS
Detail A
Detail B
Detail C
2
F
ix
Grid
18-100
| V
2
|
MO
UNTING INSTRUCTIONS
| 20
18
11
S C H L E T T E R S O L A R G M B H | S U B J E C T T O M O D I F I C A T I O N S
9
Содержание FixGrid18-100
Страница 1: ...FixGrid18 100 MOUNTING INSTRUCTIONS...