Mounting instructions

Risk of injury! People may be injured by falling objects. Before starting the 
installation work, block off the danger zone and warn people in the vicinity.

Ensure that the flat roof waterproofing is compatible with the mounting system. 
The roof drainage system has to be included in the planning of your solar plant.

In the case of very uneven roofs or roof waterproofing, compensatory measures 
may have to be taken in order to ensure a uniform introduction of the load.

Necessary distances to roof edges have to be maintained.
The maximum field size depends on the type of roof.
For foil roofs, it is max. 10 m; for concrete roofs, it can also be larger in individual 
cases.

In the case of roofs with substrate or gravel roofing, it has to be ensured that a 
sufficiently non-slip connection occurs.

Please check the existing pitch of the roof and whether the mounting system has 
to be secured against slipping. 

The surface load is not permitted to exceed the residual load-bearing capacity of 
the building!

The partial surface pressure, which acts on the roof membrane and insulation 
under the base rails, is not allowed under any circumstances to exceed the 
maximum permissible surface pressure.
Current country-specific rules and regulations have to be observed.
Roof cleaning! In order to ensure that the base rails are supported across their 
entire surface, impurities such as moss, leaves, dirt, stones, etc. have to be 
removed.

If there is a lightning protection system involved, it is important to determine 
the extent to which integration by a certified lightning protection company is 
necessary. Whether or not the lightning protection requirements change as a 
result of the installation also has to be determined.

Due to static reasons, the installation of a single module row is not permitted!

Prior to installation, the roof has to be checked for damage of any kind, 
particularly water beading or damage to the roof membrane. These should be 
documented with photos in order to be able to counteract any recourse claims.
The system has been developed for modules with a width of 950-1050 mm 
(standard module dimensions according to the current status). Other module 
dimensions on request and separate verification. Information about module 
clamping pursuant to the manufacturer has to be observed.

Use only original Schletter components!

Use the current mounting instructions! Accessible on our website: 
www.schletter-group.com in the solar section under Downloads

F

ix

Grid

18-100

 |  V

2

  |  

MONTAGEANLEITUNG

  |  20

18

11 

S C H L E T T E R   S O L A R   G M B H     |     S U B J E C T   T O   M O D I F I C A T I O N S

 

2

F

ix

Grid

18-100

 |  V

2

  |  

MO

UNTING INSTRUCTIONS

  |  20

18

11 

S C H L E T T E R   S O L A R   G M B H     |     S U B J E C T   T O   M O D I F I C A T I O N S

 

3

Содержание FixGrid18-100

Страница 1: ...FixGrid18 100 MOUNTING INSTRUCTIONS...

Страница 2: ...ning of your solar plant from the Schletter configurator Risk of breakage PV modules can be damaged if they are stepped on Planning of the solar power system installation and commissioning may only be...

Страница 3: ...cific rules and regulations have to be observed Roof cleaning In order to ensure that the base rails are supported across their entire surface impurities such as moss leaves dirt stones etc have to be...

Страница 4: ...n mounting frames with the module supports Defining the base rail lengths and distances between module supports maintenance walk way width Distance a has to be adapted according to the width of the ma...

Страница 5: ...s Take into account a projection of the surface protection mat of at least 30 mm at the rail ends In the case of transversely flowing rainwater the distance has to be dimensioned on the basis of the a...

Страница 6: ...ansversely draining roof water The permissible surface pressure of the roof has to be checked Sufficient drainage of rainwater has to be ensured Align base rails parallel to each other align the FixZ...

Страница 7: ...to the alignment of the module row Apply the Rapid 16 end clamps at the top and at the bottom to the module and tighten Screws M8 T40 Place the module center clamp on the module do not tighten Connect...

Страница 8: ...the base rails see Detail A Ballasting with additional trough see Detail B Ballasting with additional ballast shafts see Detail C Ballasting from the combination of the 3 possibilities The informatio...

Страница 9: ...are turned 180 degrees recesses on the left from right to left The tray always lies with the side of the slots at the bottom and in the base rail with a positive fit At the last ballast tray the end h...

Страница 10: ...0 0 SCHLETTER SOLAR GMBH Alustrasse 1 83527 Kirchdorf GERMANY www schletter group com We reserve the right to changes including technical modification 10...