ALIGNMENT OF THE
BASE RAILS
EXTENSION OF THE
BASE RAILS
4
5
The permissible surface pressure of the roof has to be checked!
Sufficient drainage of rainwater has to be ensured!
Variant B
•
Apply 20-mm-thick and 300-mm-long strips at a distance of 100 mm
•
Load introduction on large area (for high loads and/or soft subsoil with low
permissible surface pressure)
•
Also suitable for transversely draining roof water
The permissible surface pressure of the roof has to be checked!
Sufficient drainage of rainwater has to be ensured!
•
Align base rails parallel to each other; align the FixZ system rails 18 flush and
at right angles to the base rails on the subsoil.
•
Distance g = Module 23 mm
•
Extend base rail as required.
To do so, insert the inner connector into two rails and fix each end with two self-
drilling screws.
Tool: Screwdriver with plug-in attachment 8 mm
g
F
ix
Grid
18-100
| V
2
|
MO
UNTING INSTRUCTIONS
| 20
18
11
S C H L E T T E R S O L A R G M B H | S U B J E C T T O M O D I F I C A T I O N S
6