6
– MAINTENANCE (ROUTINE AND EXTRAORDINARY)
COD.60M12/24.A.2018
EN
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
44
6.5.2
Shutdown operating procedure
1. Disconnect the production pipe and collect about
20 liters of fresh water within a tank.
2. Switch off the system by pushing the stop button.
3.
Prepare the solution carefully mixing the bottle of
SC1 in about 20 liters of unchlorinated water.
4. Connect the 3 hoses to the pump group and
watermaker as indicated above, and dip them in
the solution.