November 2003
LBA-app.
Revision --
4.4
4.4
Pre-flight inspection
SCHEMPP-HIRTH FLUGZEUGBAU GmbH., KIRCHHEIM/TECK
Ventus-2cM
FLIGHT MANUAL
CHECK LIST BEFORE TAKE-OFF
O
Water ballast in fin tank ? (if installed)
O
Loading charts checked ?
O
Parachute securely fastened ?
O
Safety harness secured and tight ?
O
Seat back and pedals in comfortable position ?
O
Fuel tank(s) in wing connected ? (if installed)
O
All controls and instruments easily accessible ?
O
Airbrakes checked and locked ?
O
All control surfaces checked with assistant
for full and free movement in correct sense ?
O
Trim correctly set ?
O
Flaps set for take-off ?
O
ASI switched to Pitot head in fin or nose ?
O
Canopy closed and locked ?
O
Fuel quantity checked ?
O
Function of water pump checked ?
(
NO
flashing red signal)
O
Coolant liquid temperature checked ?
O
Ignition circuits checked ?
O
Take-off RPM checked ?
O
Rear-view mirror properly adjusted ?
CHECK LIST FOR SELF-LAUNCHING
Содержание Ventus-2cM
Страница 11: ......