SCHEMPP-HIRTH FLUGZEUGBAU GmbH., KIRCHHEIM/TECK
Ventus-2cM
FLIGHT MANUAL
(4)
(ctd.)
o)
Check function of water pump with ignition ON.
Check pump, plug and hoses for proper attachment
p)
Check coolant liquid quantity.
Check cap of expansion reservoir for firm attachment
q)
Check locking of quick-disconnect coupling of fuel lines and
harness connection
(5) a)
Check condition of tail skid or wheel. If the latter is installed,
check tire pressure:
2.5 bar / 36 psi (see placard)
b)
Should a total energy compensation probe be used, mount it and
check the line (when blowing gently from the front to the probe with
pneumatic valve for the TEK probe set at “Power off”, the variome-
ter(s) connected should read “climb”)
c)
Check that the fin-mounted PITOT tube is clear.
When blowing gently into this probe, the ASI must register
(with pneumatic valve for the pitot pressure set at “Power off”)
d)
Check that the opening for the fuel tank vent line
(at the upper end of the fin) is clear
Should a water ballast fin tank be installed (option):
e)
Check that the fin tank spill holes are clear
f)
Check water ballast level in fin tank (in case of doubt,
discharge
ballast)
g)
Check that the dump hole for the fin tank in the tail wheel
fairing (if installed) is clear
November
2003
LBA-app.
Revision --
4.3.4
Содержание Ventus-2cM
Страница 11: ......