8. Mounting
Danger from Electrical Voltage
The unit must be mounted by specialized personnel (qualified electricians). The
personnel must ensure that the cabinet is disconnected from the electrical supply
for the duration of the mounting operation. Therefore, take the cabinet out of
operation, following the relevant instructions before mounting work commences.
Danger Through Incorrect Work on the Unit
Only specialists are allowed to put the unit into operation.
Mounting Preparations
Several points must be checked before the unit can be mounted. These checks must be made to ensure safety and the
trouble-free operation of the unit. These checks must be carried out with absolute thoroughness to ensure that the unit
works perfectly.
Transport Damage Check
Upon delivery, the carton containing the unit must be examined for signs of transport damage. Any transport damage to
the carton could indicate that the unit itself has been damaged in transit, which in the worst case could mean the unit will
not function.
Location and Space Requirements
The location of the cabinet must allow for sufficient air circulation to and from the unit. The unit should be mounted roughly
horizontally. It is therefore advisable to check that the cabinet is in a horizontal position. The max deviation from the vertical
or horizontal should not exceed 20 degrees.
Sealing
To guarantee that the unit works perfectly, ensure that the control cabinet is completely sealed (min NEMA 12) and that a
good seal exists between the control cabinet and the unit. If necessary, the cabinet mounting surface should be reinforced.
9. Mounting Principle
1. Heat Exchanger
2. Mounting Gasket
3. Slotted Stud M6 x 1”
4. Enclosure
5. Washer A6.4
6. M6 Lock Nut