1
O p e r a t i n g i n s t r u c t i o n s
Series-65H Hoist Pos 3
V115E_09.20
3. OPERATING INSTRUCTIONS
3.1 Prior to the Use
.......................................................................3
3.1.1 Check List ........................................................................3
3.1.2 Functional Testing ...........................................................4
3.2 The Hoist's Start-up
...............................................................5
3.3 Start and Stop of the Hoist
.................................................7
3.3.1 Relay Control ..................................................................8
3.3.2 PLC (Programmable Logic Control) ver. 1 ...................9
3.3.3 PLC (Programmable Logic Control) ver. 2 .................11
3.4 Closing the Operation
......................................................11
3.5 Erection, Maintenance or Inspection Operations
..12
3.6 Evacuation people from the cage
..............................13
3.6.1 Evacuation people from the cage
- when the system not responce- PLC ver.2 .........................13
3.6.2 Evacuation during Power Cut .....................................14
3.7 Safety Brake ..............................................................
15
3.7.1 Safety Brake for hoist with: relay and PLC ver.1 ........15
3.7.2 Safety Brake for hoist with: PLC ver.2 ..........................16
3.8 Safety Limit - for PLC ver. 1 .......................................
17
3.8.1 The Bottom Safety limit .................................................17
3.8.2 The Top Safety Limit ......................................................18
3.9 Safety Limit - for PLC ver. 2 .......................................
19
3.9.1 The Bottom Safety limit .................................................19
3.9.2 The Top Safety Limit ......................................................20
Содержание 65H Series
Страница 2: ...2 T a b l e o f C o n t e n t s Series 65H Hoist Pos 0 V115E_09 20...
Страница 10: ...G e n e r a l i n f o r m a t i o n 2 V115E_09 20 Series 65H Hoist Pos 1...
Страница 26: ...G e n e r a l i n f o r m a t i o n 18 V115E_09 20 Series 65H Hoist Pos 1 4450 L L1 L2 TWIN...
Страница 34: ...G e n e r a l i n f o r m a t i o n 26 V115E_09 20 Series 65H Hoist Pos 1...
Страница 36: ...S a f e t y i n s t r u c t i o n s 2 V115E_09 20 Series 65H Hoist Pos 2...
Страница 46: ...S a f e t y i n s t r u c t i o n s 12 V115E_09 20 Series 65H Hoist Pos 2 MAX 1000 kg TH_10E...
Страница 54: ...S a f e t y i n s t r u c t i o n s 20 V115E_09 20 Series 65H Hoist Pos 2 Tx527...
Страница 55: ...21 S a f e t y i n s t r u c t i o n s V115E_09 20 Series 65H Hoist Pos 2...
Страница 82: ...O p e r a t i n g i n s t r u c t i o n s 24 V115E_09 20 Series 65H Hoist Pos 3...
Страница 84: ...2 V115E_09 20 T r o u b l e s h o o t i n g Series 65H Hoist Pos 4...
Страница 124: ...10 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Страница 141: ...27 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Overload system circuit board inside electric box P2...
Страница 144: ...30 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Picture 3c Picture 3b...
Страница 154: ...40 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Страница 156: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...
Страница 164: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...