S a f e t y i n s t r u c t i o n s
6
V115E_09.20
Series-65H Hoist Pos 2
During the mounting and dismounting op-
erations the working site must be secured
and protected with a fence and warning
signs.
During the mounting and dismounting the
wind velocity should not exceed 12,5 m/s.
For the mounting and dismounting opera-
tions carried out high up use a proper per-
sonnel lifting device especially designed for
this purpose or equipment otherwise safe
and suitable for this task. The hoist parts
must not be used as ascending supports.
Carefully follow the instructions on founda-
tion and supporting of the hoist given in the
installation instructions.
Separate parts and larger structural ele-
ments must be fastened to the cage dur-
ing the work. Make sure that they do not
cause any danger. Use only appropriate
loading device and load fastening device
which are in good condition.
If the surface of wind exposed area is in-
creased e.g when mounting a billboard to
hoist cage, the wind load has to be taken
into consideration.
Wind speed may increase near surround-
ing of tall buildings.
The electrical installations are allowed to
be carried out only by qualified electri
-
cians.
The hoist shall be protected against light-
ning.
Always use safety harness during the
mounting and dismounting operations.
There is always the risk of falling down.
The brackets for lifting the drive unit and
hoist cage are also suitable for safety har-
ness fixing. These brackets are shown in the
picture below.
2.4 Mounting and Dismounting
☞
☞
Entanglement danger when us-
ing the brackets in the drive unit
and driving the hoist.
Thread the harness rope through
the railing when using the
brackets outside the railings.
Содержание 65H Series
Страница 2: ...2 T a b l e o f C o n t e n t s Series 65H Hoist Pos 0 V115E_09 20...
Страница 10: ...G e n e r a l i n f o r m a t i o n 2 V115E_09 20 Series 65H Hoist Pos 1...
Страница 26: ...G e n e r a l i n f o r m a t i o n 18 V115E_09 20 Series 65H Hoist Pos 1 4450 L L1 L2 TWIN...
Страница 34: ...G e n e r a l i n f o r m a t i o n 26 V115E_09 20 Series 65H Hoist Pos 1...
Страница 36: ...S a f e t y i n s t r u c t i o n s 2 V115E_09 20 Series 65H Hoist Pos 2...
Страница 46: ...S a f e t y i n s t r u c t i o n s 12 V115E_09 20 Series 65H Hoist Pos 2 MAX 1000 kg TH_10E...
Страница 54: ...S a f e t y i n s t r u c t i o n s 20 V115E_09 20 Series 65H Hoist Pos 2 Tx527...
Страница 55: ...21 S a f e t y i n s t r u c t i o n s V115E_09 20 Series 65H Hoist Pos 2...
Страница 82: ...O p e r a t i n g i n s t r u c t i o n s 24 V115E_09 20 Series 65H Hoist Pos 3...
Страница 84: ...2 V115E_09 20 T r o u b l e s h o o t i n g Series 65H Hoist Pos 4...
Страница 124: ...10 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Страница 141: ...27 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Overload system circuit board inside electric box P2...
Страница 144: ...30 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Picture 3c Picture 3b...
Страница 154: ...40 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Страница 156: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...
Страница 164: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...