20
V115E_09.20
Service and maintenance
Series-65H Hoist Pos 5
The Correct Function of the Safety Brake
The safety brake is working correctly and
stops the falling movement of the cage. Si-
multaneously the safety brake limit switch
disconnects the electric safety circuit of the
hoist.
-
Turn the remote control key switch
(S61), “
Safety brake bypass
”, the safe-
ty brake limit switch (S10) is bypassed
and the hoist can be operated with
the remote control.
-
Drive the cage with the remote con-
trol button (S62) upwards for about 1
meter so that the safety brake centrif-
ugal clutch is detached from the brake
cone and the safety brake is released.
-
Drive the cage with the remote control
button (S63) down to the ground sta-
tion and disconnect the remote con-
trol from the connector (X15).
-
Switch the disconnecting switch (F1) in
the ground station control box to posi-
tion “0”.
-
Adjust the safety brake according to
the instructions given in point 5.4.4 Ad-
justing the Safety Brake.
-
After finishing the work switch the dis
-
connecting switch (Q1) in the ground
station control box back to position “1”.
-
Concerning the hoists with logic con-
trol turn the key switch (S20) to position
“1-Auto”.
The Incorrect Function of the Safety Brake
-
Drive the cage with the remote con-
trol button to the ground station.
-
Switch the “Disconnecting switch” F1 in
the ground station control box to posi-
tion “0”.
-
Remove the safety brake and send it
to the manufacturer for repair.
-
Install a new safety brake and repeat
the test.
The safety brake does not stop the falling
movement of the cage. The movement
was stopped with the key switch (S61), and
the motor brakes stopped the cage.
Содержание 65H Series
Страница 2: ...2 T a b l e o f C o n t e n t s Series 65H Hoist Pos 0 V115E_09 20...
Страница 10: ...G e n e r a l i n f o r m a t i o n 2 V115E_09 20 Series 65H Hoist Pos 1...
Страница 26: ...G e n e r a l i n f o r m a t i o n 18 V115E_09 20 Series 65H Hoist Pos 1 4450 L L1 L2 TWIN...
Страница 34: ...G e n e r a l i n f o r m a t i o n 26 V115E_09 20 Series 65H Hoist Pos 1...
Страница 36: ...S a f e t y i n s t r u c t i o n s 2 V115E_09 20 Series 65H Hoist Pos 2...
Страница 46: ...S a f e t y i n s t r u c t i o n s 12 V115E_09 20 Series 65H Hoist Pos 2 MAX 1000 kg TH_10E...
Страница 54: ...S a f e t y i n s t r u c t i o n s 20 V115E_09 20 Series 65H Hoist Pos 2 Tx527...
Страница 55: ...21 S a f e t y i n s t r u c t i o n s V115E_09 20 Series 65H Hoist Pos 2...
Страница 82: ...O p e r a t i n g i n s t r u c t i o n s 24 V115E_09 20 Series 65H Hoist Pos 3...
Страница 84: ...2 V115E_09 20 T r o u b l e s h o o t i n g Series 65H Hoist Pos 4...
Страница 124: ...10 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Страница 141: ...27 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Overload system circuit board inside electric box P2...
Страница 144: ...30 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5 Picture 3c Picture 3b...
Страница 154: ...40 V115E_09 20 Service and maintenance Series 65H Hoist Pos 5...
Страница 156: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...
Страница 164: ...Inspection forms V115E_09 20 Series 65H Hoist Pos 8 SC HOIST INSPECTION FORMS...