Assembly and operating instructions Type ALE3D5FS10
65 A Three-phase active power energy meter with S-Bus interface, Pic. 1
Description
Energy meter with S-Bus interface enables the reading of
all relevant data like meter reading, electricity, voltage and
power (active and reactive).
Indicating elements (Pic. 4)
T1total (kWh)
■
Shows total consumption Tariff 1
T1part. (kWh)
■
Shows partial consumption for
Tariff 1, this value is resettable
T2total (kWh)
■
Shows total consumption Tariff 2
T2part. (kWh)
■
Shows partial consumption for
Tariff 2, this value is resettable
P (kW)
■
Shows the instantaneous power
per phase or all phases
U (V)
■
Shows the voltage per phase
I (A)
■
Shows the current per phase
kWh
■
Shows the unit kWh when the
consumption is displayed
L1 / L2 / L3
■
For P-, U-, I- or Error display, the
corresponding phase is displayed
Error
■
In case of missing phase or wrong
current direction. The correspond-
ing phase is additionally displayed.
Technical data
Connection
■
Pic. 2
diagram
Dimensions
■
Pic. 3
Accuracy class
■
B according to EN50470-3,
1 according to IEC62053-21
Reference, Maxi-
■
I
ref
= 10 A, Im
ax
= 65 A, Ist
=
40 mA
mum, initial current
Operating voltage
■
3 × 230/400 VAC, 50 Hz
Tolerance –20%/+15%
Counting range
■
00'000,00…999'999,9 kWh
LED-Ouptut
■
1000 Imp/kWh
Connections
■
Conductor cross-section 1,5–16 mm
2
,
Main circuit
screwdriver pozi no. 1, slot no. 2,
torque 1,5–2 Nm
Connections
■
Conductor cross-section max. 2,5 mm
2
,
Control circuit
screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
Operating
■
−25… +55°C (noncondensing
temperature
according standard EN50470)
Environment
■
Mechanical M2
Electromagnetic E2
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to
condensate build-up, acclimatise the meter at room
temperature for about half an hour before connecting.
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk of
an electric shock.
Declaration of Conformity CE
We, Saia-Burgess Controls AG, CH 3280 Murten (Switzer-
land), herewith declare, on our own responsibility that
the products:
■
ALE3D5FS10C3A00
which this certificate refer to, are in accordance with the
directive 2004/22/EG (MID) and the following standards:
■
EN50470 parts 1 and 3 (electronic meter), of
October
2006.
Murten, 30.04.2013
Conformity Assessment Body:
METAS-Cert, Nr. 1259
CH-3003
Bern-Wabern
Signed: Urs Tanner, Site Quality Leader
English
Installation instructions
The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
Operation of the LCD display
See page with LCD menu navigation
4 319 5109 0E
03.2017
Subject to change without notice