REPLACEMENT OF PARTS

To replace safety valve

• Drain down entire heating system.
• From below boiler, disconnect heating flow pipe
from rear of fixing jig.
• Undo heating flow connection on front of fixing
jig. Remove clip from heating flow pipe connec-
tion on right of front section of reversing valve. Pull
pipe towards right and out of reversing valve. Re-
move pipe from boiler and keep.
• From below boiler, disconnect safety valve dis-
charge pipe.
• Working through boiler from the front using a long
screwdriver, undo and remove screw holding safety
valve assembly to fixing jig.
• Remove complete safety valve assembly from
fixing jig and remove from boiler.
• Fit replacement safety valve in reverse order to
removal.

Note:

 Apply silicone grease to 'O' ring before fixing

pipe into right hand side of reversing valve.
• Refill heating system and boiler, vent and pres-
surise as described previously.

To replace heat exchanger

• Drain down both heating and hot water circuits
of boiler only as described previously.

Note:

 It is not necessary to drain entire heating sys-

tem to carry out this work.
• Remove combustion chamber cover as de-
scribed in 

'Routine Cleaning and Inspection'.

• Remove two clips from heating connections to
left side of heat exchanger.
• Remove clip holding pump outlet connection
into pump and slide connection up pump outlet
pipe. Pull complete pipe down to disengage from
heat exchanger.
• Remove retaining clip from LHS pipe connection
on front section of valve and disengage pipe.
• Disengage pipe downwards from heat ex-
changer.
• Unscrew and disconnect two hot water connec-
tions to right side of heat exchanger.
• Grasp both sides of heat exchanger and slide
forwards and out of boiler.
• Fit replacement heat exchanger in reverse or-
der to removal.

Note:

 Use new sealing washers and 'O' rings pro-

vided.
• Open isolating valves on flow and return con-
nections, refill, vent and pressurise boiler. Check for
leaks.

To replace expansion vessel
1 Boiler in place
Note:

 The expansion vessel can be replaced with

the boiler in place provided that there is a mini-
mum clearance of 400mm on one side of the boiler
and that no vertical pipework passes between
boiler and wall on that side.
• Drain down the heating circuit of the boiler only
as described in 

'To replace pump'.

Note:

 It is not necessary to drain entire heating sys-

tem to carry out this work.
• Remove pump from boiler as described previ-
ously.

• Unscrew pipe connection nut from expansion
vessel and disengage pipe from connection. Keep
sealing washer.
• Whilst supporting weight of vessel, push bottom
of vessel away from boiler, disengaging threaded
connection from hole in rear of boiler. Allow vessel
to drop out of its two upper retaining brackets.
• Remove vessel to side of boiler.
• Fit replacement expansion vessel in reverse or-
der to removal ensuring that sealing washer is fit-
ted to vessel pipe connection.
• Check that vessel charge pressure is 1bar. Cor-
rect if necessary.
• Open isolating valves on flow and return con-
nections, refill, vent and pressurise boiler. Check for
leaks.

2 Boiler removed from wall

• Drain down the heating circuit of the boiler only
as described in 

'To replace pump'.

Note:

 It is not necessary to drain entire heating sys-

tem to carry out this work.
• Ensure that gas and electrical supplies to boiler
are turned off.
• Disconnect flue from either rear or top of boiler
as applicable.
• Disconnect external controls connections, if ap-
plicable.
• Unscrew and disconnect five connections be-
tween fixing jig and boiler.
• Disengage pipe connections. Lift boiler off hang-
ing bracket and place on a convenient working
surface.
• Remove expansion vessel from boiler as de-
scribed in previous section.
• Fit replacement vessel in reverse order to removal
and check charge pressure.
• Replace boiler on wall, tighten all connections,
gas connection first, ensuring that all sealing wash-
ers, filters and the cold water flow regulator are fit-
ted before tightening.
• Reconnect flue system.
• Open isolating valves on flow and return con-
nections, refill, vent and pressurise boiler. Check for
leaks.
• Reconnect external controls connections, if ap-
plicable.
• Reconnect gas and electrical supplies to boiler.
• Check for gas soundness.

To replace boiler thermistor

• Locate boiler thermistor on heating flow pipe on
left hand side of boiler, 

see diagram 37.

Diagram 37

Содержание THEMA F 23 E

Страница 1: ...1 Heating and hot water for the professionals 01773 828100 IN WARRANTY TECHNICAL HELPLINE 01773 828400 THIS IS A CAT II2H3 APPLIANCE THEMA F Installation and Servicing Instructions...

Страница 2: ...essure switch 19 Spark generator 19 Main printed circuit board 19 Ignition printed circuit board 20 Pump 20 Temperature Pressure gauge 20 Reversing valve assembly 20 Reversing valve front section 21 L...

Страница 3: ...ec tion Alternatively the boiler is designed to allow the flue system to be connected to the top of the boiler top outlet flue connection Refer to the flue fitting instructions Electrical components h...

Страница 4: ...eating output automatically variable from kW 8 9 8 9 8 9 BTU H 30 000 30 000 30 000 to kW 23 3 18 5 23 3 BTU H 80 000 63 000 80 000 Efficiency 91 5 90 5 91 5 Heating adjustment 38 C to 90 C Expansion...

Страница 5: ...799 51214 54628 58042 61456 64871 68285 71699 75113 79552 Heat input kW 11 9 13 2 14 4 15 7 16 9 18 1 19 2 20 4 21 5 22 7 23 8 24 9 26 0 26 9 28 3 Btu h 40678 45130 49332 53481 57579 61627 65626 69575...

Страница 6: ...ressure switch 24 Gas cock A Heating return B Cold water inlet C Heating flow D Domestic hot water flow E Gas supply THEMA F 23 E 22 23 A C E 4 16 17 19 6 8 9 10 11 13 12 21 3 14 24 3 Ignition module...

Страница 7: ...to right the fixing jig comprises A Heating return with isolating valve m C Heating flow with isolating valve q drain screw r and safety valve s E Gas service cock 1 2 5 7 r p q 25 23 113 23 s A C E m...

Страница 8: ...made for filling the system at low level The use of a WRC approved filling loop is strongly recommended connected as shown in diagram 6 Safety valve discharge WARNING It must not discharge above an en...

Страница 9: ...talled immediately protect the various couplings to prevent any ingress of foreign materials e g plaster paint etc Terminal position The minimum acceptable spacings from the ter minal to obstructions...

Страница 10: ...age boiler upper part onto the hook see dia gram 9 Allow the boiler to seat down onto support plate see diagram 10 Fit filter and washers strictly adhering to the se quential order and directions show...

Страница 11: ...aged Calculation of flue cutting lengths Measure wall thickness e mm For side flues measure distance from inside face of side wall to centre line of flue and subtract 176 mm for right hand flue or sub...

Страница 12: ...e outer end of pipe A see diagram 16 Fit outer pipe A into wall with groove to the outside Pull pipe inwards to bring rubber sealing collar hard up against external wall see diagram16 Fit internal pla...

Страница 13: ...ue and subtract 205 mm for both right and left hand flues to get dimension a mm Refer to table 1 for cutting lengths of both inner and outer flue pipes for each of the various flue options available I...

Страница 14: ...arning This appliance must be wired in accord ance with these instructions Any fault arising from incorrect wiring cannot be put right under the terms of the Saunier Duval guarantee Time clock A mecha...

Страница 15: ...wing the instructions given in the User Instruc tions set boiler to run in central heating mode Set boiler thermostat for maximum temperature and check that any external controls if fitted are calling...

Страница 16: ...inue to run The boiler will be ready to operate when the fault has been cleared In case of power supply failure The boiler no longer operates As soon as power supply is restored the boiler will be aut...

Страница 17: ...ss The THEMA F 23 E has a built in bypass This must be adjusted according to the requirements of the sys tem refer to the flow rate pressure curve diagram 3 The boiler is supplied with the built in by...

Страница 18: ...e insulation material on inside faces of combustion chamber Cleaning the burner Pull off leads to ignition electrode Pull off lead to flame sense electrode Unscrew and remove screw holding earth lead...

Страница 19: ...rnal controls connector from mount ing bracket Undo two screws securing microswitch assembly to reversing valve assembly see diagram 29 Remove microswitch assembly from reversing valve Fit replacement...

Страница 20: ...onto inlet connection on replacement pump Fit replacement pump in reverse order to re moval Note Apply silicone grease to pump outlet con nection O ring before assembly Refit pump electrical connecti...

Страница 21: ...it U shaped retaining clip Note Use bypass valve fitted to original front sec tion for guidance Fit replacement front section with gasket to rear section Locate front plate and replace six fixing scre...

Страница 22: ...f water valve When clip is fitted check con nection by pushing pipe back away from water valve Refit telescopic connecting pipe to inlet of wa ter valve after applying silicone grease to O ring Fit re...

Страница 23: ...mini mum clearance of 400mm on one side of the boiler and that no vertical pipework passes between boiler and wall on that side Drain down the heating circuit of the boiler only as described in To rep...

Страница 24: ...and Inspection Pull off lead from flame sense electrode Unscrew and remove screw holding earth lead to flame sense electrode Unscrew and remove screw holding flame sense electrode onto burner Fit rep...

Страница 25: ...14 8 14 9 6 8 6 6 6 4 6 2 6 3 2 2 2 1 9 1 9 2 8 4 8 3 8 2 8 1 12 1 12 2 P THEMA F 23 E PCB N L P Ex EV1 EV TRA 6 14 6 15 6 11 CTN TH V3V TA K5 K4 Pr FL Ra FA Al 6 12 6 9 13 2 13 3 13 1 13 4 14 1 14 2...

Страница 26: ...a logical step by step pro cedure starting at the beginning of the appropriate fault finding chart WARNING Always isolate the boiler from the electri cal supply before carrying out any electrical rep...

Страница 27: ...NOT RUNNING FAN NOT RUNNING Replace main PCB YES CHART 4 NO NO Is pump jammed Replace pump motor NO Free pump Replace main PCB Is fan jammed Replace fan NO SPARE PARTS When ordering spare parts quote...

Страница 28: ...28 108198 B 06 98...

Отзывы: