Saunier Duval SYLVA FF 24 E Скачать руководство пользователя страница 9

9

Front panel:

Lift front insulation panel free from retaining lug on
combustion chamber cover.

Rear panel:

Lift rear insulation panel free from retaining lug at

rear of combustion chamber by tilting forward.

Side panels:

Lift side panels free from retaining lugs on combus-

tion chamber sides by tilting slightly.

Fit replacement insulation panels in reverse order

to removal

Refit combustion chamber cover, heat exchanger,

flue hood and fan in reverse order to removal.

To replace burner

Remove burner as described in '

Routine Cleaning

and Inspection

'.

Assemble replacement burner, supplied in parts, as
follows:

Fit burner injectors to burner injector bar and tighten.

Note: 

Make sure that injector size, marked on each

injector, is the same as that given in ‘

Technical Data

for the type of gas being used.

Fit injector bar into burner, secure using four screws.

Fit replacement burner into boiler in reverse order

to removal.

To replace burner injectors

Remove burner as described in '

Routine Cleaning

and Inspection

'.

Unscrew and remove four injector bar retaining

screws and separate injector bar from burner.

Unscrew and remove injectors from injector bar.

Fit replacement injectors to injector bar and tighten.

Note:

 Make sure that injector size, marked on each

injector, is the same as that given in ‘

Technical Data

for the type of gas being used.

Reassemble burner and fit into boiler in reverse order

to removal.

To replace ignition/flame sense electrode

Remove burner as described in ‘

Routine Cleaning

and Inspection

’.

Undo and remove screw securing electrode onto

burner.

Fit replacement electrode onto burner in reverse

order to removal.

Refit burner into boiler in reverse order to removal.

REPLACEMENT OF PARTS

To replace central heating expansion vessel

Drain down heating circuit of boiler only as

described in '

To replace pump

'.

Note:

 It is not necessary to drain down entire heating

system to carry out this work.

Isolate electrical supply to boiler.

Undo pipe coupling at base of expansion vessel.

Supporting expansion vessel, unscrew and remove

screws securing expansion vessel to boiler.

Lift vessel out of boiler.

Fit replacement vessel to boiler in reverse order to

removal, ensuring that sealing washer is fitted to pipe
connection before tightening.

Ensure that expansion vessel charge pressure is 1,0

bar (15 psi) using a pressure gauge. If necessary,
increase pressure using a car or cycle tyre pump
connected to the Schrader valve.

Open isolating valves on flow and return connec-

tions, refill, vent and pressurise boiler.

Check for leaks.

To replace domestic expansion vessel

To replace domestic expansion vessel it is necessary
to drain entire storage cylinder, preferably when cold.

Isolate electrical supply to boiler.

Close isolating valve (

c

) on cold water inlet pipe,

see diagram 3

.

Drain upper section only of storage cylinder by

attaching a plastic tube to drain outlet and opening
drain valve knob anticlockwise, 

see diagram 4

. To

assist draining, open one or more hot water taps.

Undo pipe coupling to expansion vessel.

Undo nut securing expansion vessel to boiler.

Lift expansion vessel out of boiler.

Fit replacement vessel to boiler in reverse order to

removal, ensuring that sealing washer is fitted to pipe
connection before tightening.

Ensure that expansion vessel charge pressure is 3

bar (45 psi) using a pressure gauge. If necessary,
increase pressure using a car or cycle tyre pump
connected to the Schrader valve.

Open isolating valves on flow and return connec-

tions, refill, vent and pressurise boiler.

Check for leaks.

To replace high limit thermostat

Locate high limit thermostat on left hand side of

heat exchanger below central heating flow
connection, 

see diagram 9

.

Disconnect two electrical connectors from thermos-

tat

Unscrew and remove two self tapping screws

securing thermostat to heating flow pipe.

Remove thermostat.

Fit replacement thermostat in reverse order to

removal using heat sink compound supplied.

Reconnect two leads to thermostat, the polarity is

not important.

To replace combustion chamber insulation

Remove fan, flue hood and heat exchanger as

described in ‘

To replace heat exchanger

’.

Unscrew and remove four screws securing combus-

tion chamber cover to combustion chamber.

Remove combustion chamber cover.

Diagram. 9

Содержание SYLVA FF 24 E

Страница 1: ...Servicing instructions THIS IS A CAT II2H3 APPLIANCE SYLVA 01773 828100 IN WARRANTY TECHNICAL HELPLINE 01773 828400...

Страница 2: ...2...

Страница 3: ...switch 6 Printed circuit board 6 Central heating thermistor 6 Central heating temperature control 6 Pump 6 7 Temperature gauge 7 Pressure gauge 7 3 way valve head 7 3 way valve 7 Loss of water switch...

Страница 4: ...fluid The maximum domestic hot water flow rate is 12 litres minute Remove boiler casing as follows Upper front panel Remove by pulling free from the spring clips at the top and bottom Side panels Rem...

Страница 5: ...only of storage cylinder preferably when cold Isolate electrical supply to boiler Close isolating valve c on cold water inlet pipe see diagram 3 Drain upper section only of storage cylinder by attach...

Страница 6: ...rew and disconnect two incoming mains wi res Unscrew and disconnect two mains warning light wires Remove screws securing PCB to control panel and lift out PCB Fit replacement PCB in reverse order to r...

Страница 7: ...drain down entire heating system to carry out this work Remove 3 way valve head as described previously Unscrew three nuts securing 3 way valve to pipework and lift out 3 way valve making note of the...

Страница 8: ...connection on fixing jig see diagram 3 Refill storage tank and vent cylinder Check for leaks To replace anode To replace anode it is necessary to drain upper sec tion only of storage cylinder preferab...

Страница 9: ...nscrew and remove screws securing expansion vessel to boiler Lift vessel out of boiler Fit replacement vessel to boiler in reverse order to removal ensuring that sealing washer is fitted to pipe conne...

Страница 10: ...Cold water inlet C Heating flow D Domestic hot water flow F Gas supply 1 3 way valve 2 Loss of water switch 3 Pump 4 CVI unit 5 Gas valve 6 Ignition electrode 7 Injector manifold 8 Flame detection ele...

Страница 11: ...81 m3 h 2 10 kg h 2 06 kg h Gas rate minimum 1 32 m3 h 0 98 kg h 0 97 kg h Gas reference 15 1013 mbar Burner pressures burner pressures as listed in the table below must be checked after the boiler ha...

Страница 12: ...tors A7 Clock option connector BR Reset button CTN Thermistor EV1 Modulating valve EV Main gas valve EX Fan E H Summer Winter switch F1 F2 F3 Fuses FA Ignition elctrode FL Flame sense electrode IG Mai...

Страница 13: ...works but the heating doesn t refer to chart No 1 If heating works correctly but the hot water doesn t refer to chart No 2 IMPORTANT Always adopt a logical step by step procedure starting at the begin...

Страница 14: ...tral heat ing potentiometer Replace central heating thermistor Faulty PCB replace Are heating controls calling for heat NO NO NO NO NO YES DHW ok Replace domestic hot water thermostat Replace 3 way va...

Страница 15: ...fitted and free of obstructions Check for correct fit of sealed chamber cover Is pump running at full speed Does burner remain on for less than 5 seconds Is fan running at full speed Refer to chart N...

Страница 16: ...al heating safety valve 56110 12 Expansion valve 6bar 56029 13 T P relief valve 7bar 56108 14 Anode 56000 15 High limit thermostat 56012 16 Ignition flame sense electrode 56002 85890 B 07 97 CHART N 5...

Отзывы: