REPLACEMENT OF PARTS

Withdraw gas valve assembly.

Using old gas valve as a guide, transfer gas pipes

from old gas valve to replacement gas valve.

Fit replacement gas valve into boiler.

Reconnect gas pipes in reverse order to removal.

Refit electrical connections in reverse order to

removal, the polarity of the wires to the modulating
coil is not important.

To replace modulating coil

Ensure that gas supply to boiler is turned off at gas

cock.

Disconnect electrical connections to gas valve

modulating coil, 

see diagram 8.

Undo two screws securing modulating coil to gas

valve and remove coil.

Fit replacement coil in reverse order to removal.

Refit electrical connections in reverse order to

removal, the polarity of the wires to the modulating
coil is not important.

To replace central heating safety valve

If safety valve seating is damaged, it will be necessary
to replace safety valve as a complete unit, repair is
not possible.

Drain down heating circuit of boiler only as

described previously.

Note: 

It is not necessary to drain down entire heating

system to carry out this work.

Disconnect safety valve discharge pipe from safety

valve.

Remove safety valve from boiler pipework, 

see

diagram 7.

Fit replacement safety valve in reverse order to

removal.

Open isolating valves on flow and return connec-

tions, refill, vent and pressurise boiler.

Check for leaks.

To replace temperature/pressure relief valve (T&P
valve)

To replace T&P valve, it is necessary to drain upper
section only of storage cylinder, preferably when cold.

Isolate electrical supply to boiler.

Close isolating valve (

c

) on cold water inlet pipe,

see diagram 3

.

Drain upper section only of storage cylinder by

attaching a plastic tube to drain outlet and
opening drain valve knob anticlockwise, 

see

diagram 4

. To assist draining, open one or more hot

water taps.

Locate T&P valve on upper part of storage

cylinder.

Disconnect T&P valve discharge pipe.

Unscrew and remove T&P relief valve.

Fit replacement T&P valve in reverse order to

removal using a Water Research Centre approved
sealant suitable for potable water.

Open isolating valve (

c

) on cold water inlet

connection on fixing jig, 

see diagram 3

.

Refill storage tank and vent cylinder.

Check for leaks.

To replace anode

To replace anode, it is necessary to drain upper sec-
tion only of storage cylinder, preferably when cold.

Isolate electrical supply to boiler.

Close isolating valve (

c

) on cold water inlet pipe,

see diagram 3

.

Drain upper section only of storage cylinder by

attaching a plastic tube to drain outlet and
opening drain valve knob anticlockwise, 

see

diagram 4.

 To assist draining, open one or more hot

water taps.

Remove earth lead from connection at top of

anode.

Unscrew and remove anode from storage

cylinder.

Fit replacement anode in reverse order to

removal.

Open isolating valve (

c

) on cold water inlet pipe,

see diagram 3

.

Refill storage tank and vent cylinder.

Check for leaks.

To replace heat exchanger

Drain down heating circuit of boiler only as

described previously.

Note:

 It is not necessary to drain down entire

heating system to carry out this work.

Remove fan as described in ‘

Routine Cleaning

and Inspection

’.

Undo two nuts securing heating flow and return

pipes to sealed chamber bulkhead fittings, 

see

diagram 9.

Undo nuts on heating flow and return connec-

tions on heat exchanger.

Undo nuts securing sealed chamber bulkhead

fittings to sealed chamber and remove pipes and
fittings from boiler.

Note: 

Keep washers for use on reassembly.

Remove spring clip securing flue hood to heat

exchanger pipe and withdraw flue hood forwards
and out of boiler.

Disconnect electrical connectors from high limit

thermostat.

Lift heat exchanger up and out of combustion

chamber and remove from boiler.

Fit replacement heat exchanger in reverse order

to removal.

Reconnect electrical connections to high limit

thermostat, the polarity is not important.

Reconnect heating connections using new

washers supplied.

Replace flue hood and fan in reverse order to

removal.

Open isolating valves on flow and return connec-

tions, refill, vent and pressurise boiler.

Check for leaks.

To replace expansion valve

Close isolating valve (

c

) on cold water inlet pipe,

see diagram 3

.

Locate expansion valve at base of

Disconnect pipework to expansion valve and

remove valve from boiler.

Fit replacement expansion valve in reverse order

to removal.

Open isolating valves on flow and return connec-

tions, refill, vent and pressurise boiler.

Check for leaks.

Содержание SYLVA FF 24 E

Страница 1: ...Servicing instructions THIS IS A CAT II2H3 APPLIANCE SYLVA 01773 828100 IN WARRANTY TECHNICAL HELPLINE 01773 828400...

Страница 2: ...2...

Страница 3: ...switch 6 Printed circuit board 6 Central heating thermistor 6 Central heating temperature control 6 Pump 6 7 Temperature gauge 7 Pressure gauge 7 3 way valve head 7 3 way valve 7 Loss of water switch...

Страница 4: ...fluid The maximum domestic hot water flow rate is 12 litres minute Remove boiler casing as follows Upper front panel Remove by pulling free from the spring clips at the top and bottom Side panels Rem...

Страница 5: ...only of storage cylinder preferably when cold Isolate electrical supply to boiler Close isolating valve c on cold water inlet pipe see diagram 3 Drain upper section only of storage cylinder by attach...

Страница 6: ...rew and disconnect two incoming mains wi res Unscrew and disconnect two mains warning light wires Remove screws securing PCB to control panel and lift out PCB Fit replacement PCB in reverse order to r...

Страница 7: ...drain down entire heating system to carry out this work Remove 3 way valve head as described previously Unscrew three nuts securing 3 way valve to pipework and lift out 3 way valve making note of the...

Страница 8: ...connection on fixing jig see diagram 3 Refill storage tank and vent cylinder Check for leaks To replace anode To replace anode it is necessary to drain upper sec tion only of storage cylinder preferab...

Страница 9: ...nscrew and remove screws securing expansion vessel to boiler Lift vessel out of boiler Fit replacement vessel to boiler in reverse order to removal ensuring that sealing washer is fitted to pipe conne...

Страница 10: ...Cold water inlet C Heating flow D Domestic hot water flow F Gas supply 1 3 way valve 2 Loss of water switch 3 Pump 4 CVI unit 5 Gas valve 6 Ignition electrode 7 Injector manifold 8 Flame detection ele...

Страница 11: ...81 m3 h 2 10 kg h 2 06 kg h Gas rate minimum 1 32 m3 h 0 98 kg h 0 97 kg h Gas reference 15 1013 mbar Burner pressures burner pressures as listed in the table below must be checked after the boiler ha...

Страница 12: ...tors A7 Clock option connector BR Reset button CTN Thermistor EV1 Modulating valve EV Main gas valve EX Fan E H Summer Winter switch F1 F2 F3 Fuses FA Ignition elctrode FL Flame sense electrode IG Mai...

Страница 13: ...works but the heating doesn t refer to chart No 1 If heating works correctly but the hot water doesn t refer to chart No 2 IMPORTANT Always adopt a logical step by step procedure starting at the begin...

Страница 14: ...tral heat ing potentiometer Replace central heating thermistor Faulty PCB replace Are heating controls calling for heat NO NO NO NO NO YES DHW ok Replace domestic hot water thermostat Replace 3 way va...

Страница 15: ...fitted and free of obstructions Check for correct fit of sealed chamber cover Is pump running at full speed Does burner remain on for less than 5 seconds Is fan running at full speed Refer to chart N...

Страница 16: ...al heating safety valve 56110 12 Expansion valve 6bar 56029 13 T P relief valve 7bar 56108 14 Anode 56000 15 High limit thermostat 56012 16 Ignition flame sense electrode 56002 85890 B 07 97 CHART N 5...

Отзывы: