6
ENGLISH
7
ENGLISH
2.- INSTALLING THE UNIT
-
Ensure the ceiling is horizontally level, otherwise condensate water cannot drain.
-
The casing is fixed to the slab with 4 drop rods. The rods should have two nuts and washers to lock the
unit in position. The Cassette brackets will then hook over the washers.
-
When lifting the Cassette into position care should be taken not to lift the unit by the drip tray, which could
be damaged.
-
Lift unit (without the air panel) with care by its four corners only. Do not lift unit by the condensate drain
discharge pipe or by the piping connections.
-
Incline unit and insert it into the false ceiling. Insert the rods into the brackets slot.
With false ceilings minimum height (see table), it might be necessary to remove some T brackets of the
false ceiling temporarily.
-
Using level guide, line up the unit with a spirit level, and keep dimension between the fiber glass body and
the lower part of the false ceiling.
-
Line up the unit to the supporting bars of the false ceiling tightening the nuts and counternuts of the threa-
ded rods.
-
After connection of the condensate drain piping and piping connections, check again that the unit is level.
MODEL
A (mm)
035 AK
3
075 AK
83