Installation Procedure
Important: If the location of the original plug weld
holes can not be determined, space the plug
weld holes every 40 mm (1 1/2 in) apart.
1. Drill 8 mm (5/16 in) plug weld holes in the service
part as necessary in the locations noted from the
original panel.
2. Prepare all mating surfaces as necessary.
3. Apply 3M Weld-Thru Coating P/N 05916 or
equivalent to all mating surfaces.
4. Position the front upper rail on the vehicle using
3-dimensional measuring equipment. Clamp the
rail in place.
5. Plug weld accordingly.
6. Clean and prepare all welded surfaces.
7. Install all related panels and components.
8. Apply the sealers and anti-corrosion materials to
the repair area, as necessary.
9. Paint the repair area.
10. Connect the negative battery cable.
11. Enable the SIR system.
868720
868722
868719
3-38
2003 Saturn Ion
Содержание 2003 Ion
Страница 10: ...Underbody 876938 3 10 2003 Saturn Ion...
Страница 13: ...Sedan Side 876943 2003 Saturn Ion 3 13 2003 Saturn Ion...