Installation Procedure
Important: If the location of the original plug weld
holes can not be determined, space the plug
weld holes every 40 mm (1
1
⁄
2
in) apart.
1. Drill 8 mm (5/16 in) plug weld holes in the service
part as necessary in the locations noted from the
original panel.
2. Prepare all mating surfaces for welding as
necessary.
3. Apply 3M Weld-Thru Coating P/N 05916 or
equivalent to all mating surfaces.
4. Position the #4 cross bar.
5. Plug weld accordingly.
6. Clean and prepare all of the welded surfaces.
7. Install all of the related panels and components.
8. Apply the sealers and anti-corrosion materials
to the repair area, as necessary.
9. Paint the repaired area.
10. Connect the negative battery cable.
11. Enable the SIR system.
874170
874174
874167
3-142
2003 Saturn Ion
Содержание 2003 Ion
Страница 10: ...Underbody 876938 3 10 2003 Saturn Ion...
Страница 13: ...Sedan Side 876943 2003 Saturn Ion 3 13 2003 Saturn Ion...