![Satec PM295 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/satec/pm295/pm295_installation-and-operation-manual_1200390038.webp)
30
Operating The PM295
3. Operating The
PM295
3.1 Instrument Turn On
Connect the
PM295
to a suitable power source. When power is applied, the
PM295
initiates a series of self tests. Upon completion of self tests, all the front panel LEDs
light up for one second and indicate a one-digit diagnostic
code. An ‘8’ represents
normal power up. If a different diagnostic code continually appears when you apply
power to the instrument, contact your local distributor. For error codes, refer to
Section 3.4
.
Upon power up, the
PM295
assumes the
operational mode
.
3.2 Operational Mode
3.2.1 Front Panel Operation
Operational mode
is the default mode of the instrument, in which measurement
readings appear in the 11 windows on the front panel display
. Various display
formats can be selected using the front panel keypad.
Figure 3-1
shows the front
view of the instrument.
Figure 3-1 PM295 Front View