![Sartorius combics 1 Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/sartorius/combics-1/combics-1_operating-instructions-manual_1199617093.webp)
93
Installing the Interface Cable
!
Peripheral devices should be connected to the interfaces only by a trained and authorized
Sartorius technician. Any installation work that does not conform to the instructions in
this manual will result in forfeiture of all claims under the manufacturer's warranty.
!
Disconnect the equipment from power (unplug from the wall socket) before beginning
any installation work.
§
Open the Combics indicator:
remove the four cap nuts from the front panel and remove the panel.
§
Prepare the cable:
– Expose approx. 10 cm (4 in) of the cable end for installation
– Remove all but approx. 1 cm (
1
in) of the shielding and fold it back over the casing
– Strip the casing from approximately 1 cm (
1
in) of the wires and attach ferrules
to the wire ends.
§
Attach the cable gland:
!
Please use extreme caution when performing any work on the equipment that affects
this cable gland. Use a torque wrench and tighten the cable gland to 5 Nm.
– Remove the protective cap from the bore hole on the indicator.
– Guide the enclosed cable gland through the bore hole and secure it inside the housing
with the nut (1).
– Slide the cable gland over the cable until the clamps (3) are in contact with the shield (2).
Tighten the nut (4) until the sealing clamp (5) forms a slight ridge between nut and cable.
– Make sure the shield is in contact with the clamps.
§
Connect the wires securely in accordance with the terminal assignments.
§
After you close the housing again, use a pressure gauge to check the integrity of the
IP67-protection. For details, contact the Sartorius Service Center.
4
1
5
2
3
Содержание combics 1
Страница 108: ...Dimensions Scale Drawings All dimensions are given in millimeters 108 49 90 187 302 ...
Страница 113: ...113 ...
Страница 114: ...114 ...
Страница 115: ...115 ...
Страница 116: ...116 ...
Страница 117: ...117 ...