![Sartorius combics 1 Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/sartorius/combics-1/combics-1_operating-instructions-manual_1199617075.webp)
§
Connecting the cable:
– Guide the wires through the ferrite ring, wrap them around the ring once and guide them
through the ferrite ring again
– Attach the wires securely to the screw terminals
Wiring assignments:
No.
Signal name
Meaning
1
BR_POS
Bridge supply voltage (+)
2
SENSE_POS
Sense (+) for the bridge supply voltage
3
OUT_POS
Measuring voltage, positive
4
OUT_NEG
Measuring voltage, negative
5
SENSE_NEG
Sense (-) for bridge supply voltage
6
BR_NEG
Bridge supply voltage (-)
!
Please refer to the service specifications or operating instructions for the load cell
or weighing platform in question for details on the assignment of wire colors to signals. Iso-
late unused wires in accordance with industry standards
!
If a load receptor that uses 4-conductor technology is connected
(i.e., the cable from the load cell has only four wires), add wire straps to connect wires 1
and 2 (BR_POS and SENSE_POS) to wires 5 and 6 (SENSE_NEG and BR_NEG).
§
Close the Combics indicator:
Position the front panel on the indicator and attach it with the 4 cap nuts
Installing the Verification Adapter for Use in Legal Metrology
(on verifiable models only)
– If a verifiable weighing platform has been connected, the “Verification Adapter"
must be attached to the indicator on conclusion of platform installation.
This prevents unauthorized removal of the front panel.
§
Remove one of the cap nuts that attaches the front panel
§
Place the verification adapter on the screw and attach it with the slotted screw
§
Affix the control seal over the adapter and the screw
75
Содержание combics 1
Страница 108: ...Dimensions Scale Drawings All dimensions are given in millimeters 108 49 90 187 302 ...
Страница 113: ...113 ...
Страница 114: ...114 ...
Страница 115: ...115 ...
Страница 116: ...116 ...
Страница 117: ...117 ...