background image

6

Optional Pedestal Mounting

1.  First mount the electric pump on the pedestal using supplied hard-

ware.  Ensure 2 spacers are installed between the pedestal and 
the electric pump cabinet.  Tighten four bolts. 

2.  Pedestal mounting requires an existing power line in the floor.  

Locate pedestal at power source.  The power is designed to go 
through the pedestal and into the electric pump enclosure. (see 
setbacks).  

3.  Use a marker or pencil to outline the holes of the flange onto the 

base material.  We recommend checking the hole locations after 
each new anchor is placed.  Ensure the holes are at least 6” away 
from any cracks in the base material. 

4.  The drop in anchor is a female anchor designed for use in solid 

concrete only and can’t be used in brick or block base material. 
The anchor size is designated by the inside diameter of the anchor. 
The Saris Infrastructure electric pump pedestal comes with 3/8”-
16 anchors.  The diameter of the hole to be drilled is the same size 
as the outside diameter of the anchor which is ½”.  (Figure 4)

Figure 3

Figure 4

Содержание ELECTRIC BIKE PUMP

Страница 1: ...ELECTRIC BIKE PUMP OPERATION MAINTENANCE MANUAL Customer Service 800 783 7257 sarisinfrastructure com...

Страница 2: ...Register your product for updates sarisinfrastructure com registration Tell Us What You Think sarisinfrastructure com electricbikepump...

Страница 3: ...cap modules are provided with the system They bolt on to the ends of the ramp and pro vide a smooth transition on and off the Electric Bike Pump The Electric Bike Pump is attached to the stairs using...

Страница 4: ...uded 3 8 drive ratchet Marker or Pencil SAE hex key set Level Tape Measure File or sanding tool Torque Wrench Parallel Wall or object Setbacks Figure 1 Setbacks Both sides of the electric public bike...

Страница 5: ...we usually mount on the left side of the machine 2 Choose your mounting surface and fasteners If mounting to sheet metal we recommend using 14 sheet metal screws no longer than 3 4 If mounting into c...

Страница 6: ...r pencil to outline the holes of the flange onto the base material We recommend checking the hole locations after each new anchor is placed Ensure the holes are at least 6 away from any cracks in the...

Страница 7: ...he drill or by wrapping the bit with tape at the required depth We recommend a drill depth of 1 5 8 deep so that the anchor just sets down flush with the surface Figure 5 6 Before starting to drill th...

Страница 8: ...y Figure 7 8 Next insert the drop in anchor with the open side up Drop the anchor into the hole Tap lightly to get the anchor flush with the base material 9 Now take the setting tool and insert it int...

Страница 9: ...ite sides from each other You will thread the studs into the anchors prior to installing the nuts When tightening the special tamper resistant nuts always set and first tighten the anchors using stan...

Страница 10: ...er connections You will make new connections at the terminal strip 4 It is important to use a strain relief on the incoming cable to avoid strain on the terminal strip connections Electrical Hook Up 1...

Страница 11: ...nce issues arise please contact your local Approved Saris Infrastructure Distributor Required Maintenance Operation instructions for the pump are included on the faceplate of every pump via figure 9 d...

Страница 12: ...12...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16...

Отзывы: