2
2
- 8
4. Backup Operation
W-2WAY ECO-i SYSTEM
Outdoor Unit Repair Procedures
4-2-2. Backup operation by setting the failed compressor not to operate
Backup operation settings for each compressor
INV compressor
AC1 compressor
Setting for backup operation
OK
Failed
DIP switch S010:
Turn BACK UP and AC1 ON.
Failed
OK
DIP switch S010:
Turn BACK UP and INV ON.
Failed
Failed
DIP switch S010:
Turn BACK UP, INV, and AC1 ON.
Содержание AHX0752
Страница 39: ... MEMO 1 34 ...
Страница 77: ... MEMO 2 38 ...
Страница 91: ... MEMO 3 14 ...
Страница 141: ... MEMO 5 32 ...