5
5
- 29
W-2WAY ECO-i SYSTEM
Trouble Diagnosis
7. Test Pin
When the test pin on the outdoor unit control PCB is short-circuited, each part can be operated individually.
•
After turning OFF the main unit power, short circuit the test pin (CN022, WHT), then turn the power back ON.
Output is performed in the sequence shown in the table below, for 0.5 seconds each.
Output
Operation
Output
Operation
1
Relay RY024
4-way valve (205)
11
Relay RY012
Save valve (SAVE)
2
—
—
12
—
—
3
—
—
13
Relay RY003
Crank case 2 (CH2)
4
—
—
14
Relay RY002
Crank case 1 (CH1)
5
Relay RY005
Bypass valve (BPV)
6
Relay RY007
Recovery valve (ORVR)
7
—
—
8
—
—
9
Relay RY017
Refrigerant balance valve (RBV)
10
Relay RY016
Refrigerant adjustment valve (RCV)
Содержание AHX0752
Страница 39: ... MEMO 1 34 ...
Страница 77: ... MEMO 2 38 ...
Страница 91: ... MEMO 3 14 ...
Страница 141: ... MEMO 5 32 ...