Machine Operation
SY215C LC/SY225C LC Excavator OMM
4-40
Operation and Maintenance Manual — 1219
SANY
Digging a Trench
Fig. 4-49
Trench work can be done efficiently by using a suitable
bucket and positioning the tracks parallel to the trench line.
When digging a wider trench, excavate the sides first, then
remove the middle.
Vehicle Loading
Fig. 4-50
To increase efficiency, load the truck from the rear instead
of from the side.
Leveling Operation
Fig. 4-51
0002921
1. Choose the light-load mode when performing a
leveling operation. Roll the bucket out and hold it
slightly ahead of the arm.
2. Raise the boom slowly and retract the arm at the same
time. Once the arm passes the vertical position, lower
the boom slowly and keep the bucket moving parallel
to the ground.
NOTE:
Do not drag or push the bucket on the ground
while the machine is traveling.
Содержание SY215C LC
Страница 2: ...This Page Intentionally Left Blank ...
Страница 271: ...This Page Intentionally Left Blank ...