background image

 

 

 

Connection bar, positive pole output cable 

Connection bar, negative pole output cable 

FE  Functional earth cable connection terminal 

 

 

o

  Remove the polycarbonate panel by loosening the 4 screws and by slightly pressing its edges to 

pull it out. 

o

  Insert the power cables coming from the inverter and already provided with cable lugs and tubing 

inside the string box by letting the cable go through the junctions of the protective tubing. 

o

  Connect cable lugs to bars + and –. 

o

  Fasten the tubing to the junctions, making sure that IP65 degree of protection is maintained. 

o

  Insert the functional earth cable through the dedicated cable lug. 

o

  Connect the functional earth cable to the relevant terminal. 

o

  Reassemble the polycarbonate panel by pressing it and tightening the relative fastening screws. 

o

  Tighten the cable lugs, making sure that IP65 degree of protection is maintained. 

  Connect auxiliary power supply. 

 

o

  Insert cables for auxiliary power  supply provided with tubing by letting  the cable go through the 

tubing junctions of the string box  

o

  Connect power supply 

o

  Fasten the tubing to the tubing junctions, making sure that IP65 degree of protection is maintained.  

  Connect the signal cables 

o

  Connect environmental sensors. 

o

  Set up the DIP-switches on ES1004 board for the configuration of the environmental sensors. 

 

Содержание 15W00EPBA410

Страница 1: ...the Installation Guide carefully before operating the SMART STRING BOX LT products KEY TO SYMBOLS DANGER Indicates an operating procedure which if not carried out correctly may lead to injuries or ev...

Страница 2: ...he strings by operating inside the product or on strings connected to the product It is forbidden to make any technical or mechanical modifications to the product even when out of warranty DANGER Deat...

Страница 3: ...ctly forbidden to proceed with product handling and assembly operations in adverse weather conditions in snow rain or persistent fog Always check that there is no water or condensate inside the produc...

Страница 4: ...ed to the same inverter Open the cover of the SMART STRING BOX LT and open the disconnector it is NOT necessary to remove the polycarbonate panel Disconnect all the strings from the SMART STRING BOX L...

Страница 5: ...ained o Insert the functional earth cable through the dedicated cable lug o Connect the functional earth cable to the relevant terminal o Reassemble the polycarbonate panel by pressing it and tighteni...

Страница 6: ...4 board and DIP switch SW1 for termination enable disable on ES977 board M1 RS 485 IN M2 RS 485 OUT F RS 485 fuses A Rotary switch Modbus address strings 1 8 B Rotary switch Modbus address strings 9 1...

Страница 7: ...ach string on the connection screws of each fuse holder Voltage must be positive unless strings are in the shadow Extract or insert the fuse into the fuse holder DANGER Check with a current probe that...

Страница 8: ...than generally indicated UNINSTALLING THE PRODUCT Carry out the PRELIMINARY SAFETY OPERATIONS Remove the polycarbonate panel and make sure that no voltage is applied between 230 V auxiliary voltage te...

Страница 9: ...ili su santerno com Si raccomanda la lettura dell intera Guida all Installazione prima dell uso delle SMART STRING BOX LT SIMBOLOGIA PERICOLO Indica procedure operative che se non eseguite correttamen...

Страница 10: ...stringhe operando all interno del Prodotto o sulle stringhe ancora connesse al prodotto vietata qualunque modifica elettrica o meccanica interna anche fuori dal periodo di garanzia PERICOLO Pericolo d...

Страница 11: ...450 120 DIVIETO vietato procedere alle operazioni di movimentazione e montaggio del prodotto in condizioni meteo avverse presenza di neve pioggia nebbia persistente Verificare in ogni caso l assenza d...

Страница 12: ...tte le cassette stringa connesse allo stesso inverter Aprire la portella della SMART STRING BOX LT e aprire il sezionatore NON necessario rimuovere la lastra in policarbonato di protezione Scollegare...

Страница 13: ...lla terra funzionale attraverso il pressacavo dedicato o Connettere il cavo della terra funzionale al relativo morsetto o Rimontare il policarbonato di protezione premendo sul policarbonato per inseri...

Страница 14: ...sinserimento della terminazione su scheda ES977 M1 RS 485 IN M2 RS 485 OUT F Fusibili RS 485 A Rotary switch indirizzo Modbus stringhe 1 8 B Rotary switch indirizzo Modbus stringhe 9 16 SW1 DIP switch...

Страница 15: ...ibile Le stringhe devono presentare tensioni positive e simili a meno di ombreggiature Estrarre o inserire il fusibile dal portafusibile PERICOLO L apertura e la chiusura dei portafusibili non pu avve...

Страница 16: ...to a quanto prescritto DISINSTALLAZIONE Eseguire le OPERAZIONI PRELIMINARI DI MESSA IN SICUREZZA Verificare l assenza di tensione tra i morsetti di alimentazione ausiliaria 230 V tra il polo positivo...

Отзывы: