GENERAL INSTRUCTIONS 

  Only qualified and properly trained personnel may install the product. Personnel shall be aware of the risks 

involved when working on photovoltaic (PV) fields. 

  Maintenance, configuration modifications and management operations require the involvement of all 

production and maintenance personnel. These activities must be carried out in observance of health and 
safety regulations.

 

  NEVER carry out operations on the equipment when it is powered. 

  Do not carry out isolation tests between the power terminals or between the control terminals. 

  Do not touch the electronic boards unless absolutely necessary. Should this be the case, take all the 

necessary precautions to prevent damages caused by electrostatic charges. 

  Do not carry out short-circuit tests on the strings by operating inside the product, or on strings connected to 

the product. 

  It is forbidden to make any technical or mechanical modifications to the product even when out of warranty. 

 

 

DANGER 

Death from electrocution and burns due to contact with live components of the 
grid and PV field. 

 

HANDLING AND ASSEMBLY 

  On receiving delivery of the equipment, make sure that the packaging shows no signs of damage. Check 

that it complies with your order. If the delivery does not match your order, contact the supplier immediately. 

 

Name of the product 

Part Number 

Product ratings 

CE mark and reference standards 

Revision index 

Serial Number 

 

 

  Remove the product from the packaging through the sides, keeping it horizontal to the ground.  Avoid 

twisting, bumping or dropping the product. Avoid any mechanical stress.  

 

 

 
 

  All the parallel string boxes must be installed in upright position. To facilitate installation, the parallel string 

boxes come supplied with special brackets. 

  

 

Содержание 15W00EPBA410

Страница 1: ...the Installation Guide carefully before operating the SMART STRING BOX LT products KEY TO SYMBOLS DANGER Indicates an operating procedure which if not carried out correctly may lead to injuries or ev...

Страница 2: ...he strings by operating inside the product or on strings connected to the product It is forbidden to make any technical or mechanical modifications to the product even when out of warranty DANGER Deat...

Страница 3: ...ctly forbidden to proceed with product handling and assembly operations in adverse weather conditions in snow rain or persistent fog Always check that there is no water or condensate inside the produc...

Страница 4: ...ed to the same inverter Open the cover of the SMART STRING BOX LT and open the disconnector it is NOT necessary to remove the polycarbonate panel Disconnect all the strings from the SMART STRING BOX L...

Страница 5: ...ained o Insert the functional earth cable through the dedicated cable lug o Connect the functional earth cable to the relevant terminal o Reassemble the polycarbonate panel by pressing it and tighteni...

Страница 6: ...4 board and DIP switch SW1 for termination enable disable on ES977 board M1 RS 485 IN M2 RS 485 OUT F RS 485 fuses A Rotary switch Modbus address strings 1 8 B Rotary switch Modbus address strings 9 1...

Страница 7: ...ach string on the connection screws of each fuse holder Voltage must be positive unless strings are in the shadow Extract or insert the fuse into the fuse holder DANGER Check with a current probe that...

Страница 8: ...than generally indicated UNINSTALLING THE PRODUCT Carry out the PRELIMINARY SAFETY OPERATIONS Remove the polycarbonate panel and make sure that no voltage is applied between 230 V auxiliary voltage te...

Страница 9: ...ili su santerno com Si raccomanda la lettura dell intera Guida all Installazione prima dell uso delle SMART STRING BOX LT SIMBOLOGIA PERICOLO Indica procedure operative che se non eseguite correttamen...

Страница 10: ...stringhe operando all interno del Prodotto o sulle stringhe ancora connesse al prodotto vietata qualunque modifica elettrica o meccanica interna anche fuori dal periodo di garanzia PERICOLO Pericolo d...

Страница 11: ...450 120 DIVIETO vietato procedere alle operazioni di movimentazione e montaggio del prodotto in condizioni meteo avverse presenza di neve pioggia nebbia persistente Verificare in ogni caso l assenza d...

Страница 12: ...tte le cassette stringa connesse allo stesso inverter Aprire la portella della SMART STRING BOX LT e aprire il sezionatore NON necessario rimuovere la lastra in policarbonato di protezione Scollegare...

Страница 13: ...lla terra funzionale attraverso il pressacavo dedicato o Connettere il cavo della terra funzionale al relativo morsetto o Rimontare il policarbonato di protezione premendo sul policarbonato per inseri...

Страница 14: ...sinserimento della terminazione su scheda ES977 M1 RS 485 IN M2 RS 485 OUT F Fusibili RS 485 A Rotary switch indirizzo Modbus stringhe 1 8 B Rotary switch indirizzo Modbus stringhe 9 16 SW1 DIP switch...

Страница 15: ...ibile Le stringhe devono presentare tensioni positive e simili a meno di ombreggiature Estrarre o inserire il fusibile dal portafusibile PERICOLO L apertura e la chiusura dei portafusibili non pu avve...

Страница 16: ...to a quanto prescritto DISINSTALLAZIONE Eseguire le OPERAZIONI PRELIMINARI DI MESSA IN SICUREZZA Verificare l assenza di tensione tra i morsetti di alimentazione ausiliaria 230 V tra il polo positivo...