- 8 -
6‑3 Probe
Plan
Front View
⑬Probe
・
Move the object to be examined crosswise to a length direction.
Iron pieces etc. can not be detected when the object is not moved.
(Refer to 2. PRINCIPLE on page 3.)
・
The speeds 30 to 50m per minute are recommended. The detection in the speeds less than these
speeds is possible but the detecting sensitivity will become low.
⑭Probe cable
・
The cord is for connecting the probe and the main body with a standard 3m in length.
・
When the probe cable
⑭
vibrates or sways, it causes malfunction.
・
Install the probe closely to the instrument proper as possible to prevent the invasion of the noises
from the probe cable
⑭
, but keep 1m distance each other.
・
When the main body is installed at a distance from the probe, do not install the probe
cable
⑭
parallel with the cables or the cords which generate noise. Moreover, avoid to
pass near the switch box generating sparks and fix the probe cable
⑭
tightly.
⑮Cable connector
・
Surely insert the cable connector
⑮
in the receptacle
⑦
on the rear of the main body and
the receptacle
⑯
of the probe and firmly tighten the probe cable by turning the connector ring.
・
When the cable connector
⑮
is inserted insufficiently or the connector ring is not tightened firmly,
it causes malfunction due to outside noises. Be sure to tighten the connector ring.
⑯Receptacle of the probe
・
The receptacle of the probe is for connecting the cable connector
⑮
with the probe cable
⑭
.
As the same with the main body, firmly tighten the cable connector by turning the
connector ring.
⑰Effective detectable range mark
・
This is the mark showing the detectable range.
Set the inspection line so as to pass the objects to be measured within the marks on the both ends.