Installer’s Preoperational Check
THE FOLLOWING ITEMS MUST BE PERFORMED BEFORE ATTEMPTING TO OPERATE THE EQUIPMENT:
INSTALLERS PREOPERATIONAL CHECK
PAGE 2
Fig. 2
Control Switch
AUTO
CLEANOUT
O
F
F
O
F
F
1. Make certain that proper electrical connections have
been made. Plug power cord into power outlet.
2. Set each control switch (Fig. 2) to the
“CLEANOUT”
position momentarily to verify the direction of rotation of
the dasher. Looking at the front of the machine, the
dasher should rotate counter
-
clockwise.
3. Set each control switch to the
“OFF”
position.
In the event the dasher turns clockwise,
STOP
and
do not proceed any further. On three
-
phase units,
reverse the polarity.
WARNING
UNDER NO CIRCUMSTANCES SHOULD THE UNIT
BE OPERATED IN THE “AUTO” POSITION FOR MORE
THAN THREE MINUTES WITH EMPTY FREEZING
CYLINDERS . DOING SO WILL RESULT IN DAMAGE
TO THE MACHINE.
CAUTION
This machine was designed
to produce frozen slush
beverages only.
Do NOT attempt to operate
this machine with softserve
or shake type product mix.
Damage to the machine may
occur and warranty will be
void.
IMPORTANT
A MINIMUM OF 6” (152 MM)
CLEARANCE MUST BE
MAINTAINED AT THE REAR
AND SIDES OF THE MACHINE
FOR ADEQUATE VENTILATION.
IMPORTANT
Содержание 707
Страница 20: ...PAGE 15 TROUBLESHOOTING GUIDE ...
Страница 22: ...Date Service Performed Serviceman s Signature PAGE 17 Service Record SERVICE RECORD ...
Страница 23: ...Notes ...