6
Version: 20221219
B.
Validity
This manual applies to Vibro-I units in the following versions:
•
Vibro-I 10
–
80 m² Series 2
Designed for vertical installation of 1 or 4 cartridges each containing 4 or 8 HP1
modules resulting in installed membrane areas of 10 m², 20 m², 40 m² and 80 m²
Please refer to separate manuals covering
•
Vibro-I 7.5
–
20 m² Series 1
Designed for vertical installation of 3, 4, 6 or 8 HP1 modules resulting in membrane
areas of 7.5 m², 10 m², 15 m² and 20 m²
•
Vibro-I 2.5 and 5 m² Series 1
Designed for horizontal installation of a cartridge containing one or two HP1 modules
resulting in membrane areas of 2.5 m² and 5 m²
The Vibro-I should be combined with suitable feed, permeate and CIP systems. The design
and the degree of automation of such systems depend on the application and other
requirements of the end-user.