10
S&C Instruction Sheet 1022-510
Figure 2. The control faceplate, showing the load fuse location.
Figure 3. Four-jaw meter base socket configuration for capacitor
controls with catalog number suffix -J40.
Ac line
Open
Ac neutral
Close
LCD screen
Local comm port
Switches
Test points
10-A load fuse
Installation
NOTICE
Leave the 10-A fuse out until instructed to replace it
later in the installation process .
STEP 3.
Install the control.
Install the control on the meter base, pole, or panel,
in a location with minimum traffic exposure.
All IntelliCap controls have an internal terminal
strip. The terminal strip wires connect to the meter
base, cable connector, or the cable wire directly.
A meter base with a pole-mounting bracket and a
meter ring assembly is available from S&C Electric
Company.
Meter Base Mounting
STEP 4.
Confirm that the meter base socket is wired
correctly for this control.
The required socket wiring for a four-jaw plug
is shown in Figure 3. The wiring for each type of
six-jaw meter base is shown in Figures 4 through
9 on pages 11 and 12. The correct configuration for
the control is indicated by a label on the back of the
control enclosure.
Содержание IntelliCap
Страница 18: ...18 S C Instruction Sheet 1022 510 Wiring Diagrams ...
Страница 19: ...S C Instruction Sheet 1022 510 19 Wiring Diagrams ...
Страница 20: ...20 S C Instruction Sheet 1022 510 Wiring Diagrams ...
Страница 21: ...S C Instruction Sheet 1022 510 21 Wiring Diagrams ...
Страница 22: ...22 S C Instruction Sheet 1022 510 Wiring Diagrams ...
Страница 23: ...S C Instruction Sheet 1022 510 23 Wiring Diagrams ...
Страница 24: ...24 S C Instruction Sheet 1022 510 Wiring Diagrams ...