background image

TY-JS-220308-004

10

IV. Installation

1. Open the package and check whether the machine is in good condition

and whether the accessories are complete.

2. Please ensure that the working voltage of the chiller is stable and

normal.

Because the refrigeration compressor is sensitive to the power supply voltage, the normal

working voltage of our company's standard products is 210~240V (110V model is

100~120V). If wider operating voltage range is necessary, customization is available.

3. Equipment installation conditions and requirements

(1) It must be installed on a horizontal surface and not tilted.

(2)The air outlet of the chiller should be at least 1.5m away from the obstacle, and the air

inlet must be at least 1m away from the obstacle (See below diagram).

(3) Do not install in harsh environments such as corrosive, flammable gas, dust, oil mist,

conductive dust, high temperature and humidity, strong magnetic field, direct sunlight, etc.

(4) Operating Environment

Ambient Temperature

Ambient Humidity

Altitude

0~40

≤90%RH

≤3,000m

(5) Medium Requirements

Cooling medium allowed by the chiller includes purified water, distilled water, high- purity

water and other softened water. It is forbidden to use oily liquids, liquids containing solid

particles, corrosive liquids, etc. Clean the filter element and replace the cooling water

regularly (about three months is recommended) to ensure the normal operation of the

chiller.

When the chiller is stored with water at room temperature lower than 2

, it is necessary

to add anti-freezer in the chiller water tank. It is recommended to use antifreeze with a

concentration of not more than 30% containing ethylene glycol or propylene glycol. After

the temperature warms up, change to purified water, distilled water or other suggested

cooling media, let the chiller run for 30 minutes to remove the residual anti-freezer and

drain it, and then refill with unused circulating water.

4. Determine the direction of the pipeline layout according to the water

inlet and outlet of the chiller, and ensure that the waterway is clean and

free of impurities, so as to prevent impurities from entering the waterway

and causing blockage or pump failure.

5. Plug in the power cord and turn on the power switch (It is forbidden to

start without water).

Содержание CW-5000 Series

Страница 1: ...TY JS 220308 004 1 CW 5000 5200 Industrial Circulating Chiller Installation Operation Instructions...

Страница 2: ...rly so that you can refer to it whenever you need information This manual is not a quality guarantee Our company reserves the right to the interpretation of the correction of misprint and improperly d...

Страница 3: ...TENTS Notice 4 I Overview 7 II Model Illustration 7 III Product Outlines Parts 8 IV Installation 10 V Operating States Parameters Adjustment 12 VI Alarm Output Terminal 14 VII Maintenance 15 VIII Simp...

Страница 4: ...It is not permitted to install the chiller in dangerous places with inflammable gas Electrical connection a The power supply must conform to the standard indicated in the nameplate or the manual b Use...

Страница 5: ...uideline Transportation with liquid is prohibited The equipment is not allowed to be transported with liquid to prevent internal pipeline leakage Transport a The equipment should be fixed firmly befor...

Страница 6: ...rease and the power consumption will increase and the alarm will not work properly Equipment surface cleaning a Please use cleaning agents that are non corrosive to metals and plastics b Please keep t...

Страница 7: ...chiller the refrigerant in the evaporator coil absorbs the heat of the return water and vaporizes into steam The compressor continuously extracts the generated steam from the evaporator and compresses...

Страница 8: ...TY JS 220308 004 8 III Product Outlines Parts TEMPERATUR E CONTROLLER POWER SWITCH AIR INLET FILTER GAUZE...

Страница 9: ...TY JS 220308 004 9 Note The above mentioned product outlines and part names are only for one of the models and they will be slightly different in different models...

Страница 10: ...Requirements Cooling medium allowed by the chiller includes purified water distilled water high purity water and other softened water It is forbidden to use oily liquids liquids containing solid part...

Страница 11: ...ical connection 1 Please select the cable based on the max rated current indicated on the label of the chiller 2 Recommended reference standard for power cord diameter selection Rated current A 5 10 1...

Страница 12: ...eeting equipment cooling requirements The new T 504D intelligent temperature controller is designed with constant temperature control mode with water temperature maintained at 25 Users can adjust it a...

Страница 13: ...alarm display remains until the alarm condition is eliminated 5 General settings adjustment Press SET button SET to enter the user defined state Meanwhile D1 flashes and indicates that the controller...

Страница 14: ...to 26 5 if the air temperature is up to 30 5 water temperature will be between 28 0 to 27 0 Case 2 The cooling water temperature is controlled by the constant mode It is required that the water temper...

Страница 15: ...larm output port is connected with a set of normally open or normally closed contactsof the relay inside the machine The working current is required to be less than 3A while the working voltage is les...

Страница 16: ...is not triggered Water circulation pipes are blocked or a pipe is bent or deformed Check the water circulation pipe Ultra high temperature alarm Blocked dust gauze bad thermolysis Disassemble and clea...

Страница 17: ...Shengshi Industrial Zone Zhongcun Town Panyu District Guangzhou Sales Company Shanghai Top Nine Industrial Co Ltd Seller s Company Address No 208 Wulian Road Room164 Shanghai Pudong New District China...

Отзывы: