16
ԙ
The logo displaying screen and the initial screen are displayed sequentially when the electric power is switched ON after installation of the product and
it converts to the graph recording screen automatically.
ԙ
It takes about 20 seconds in screen loading
ԙ
When button is pressed at the top of the graph recording screen, the sub menu bar is displayed and when is pressed, it converts to the main screen.
2-3. Basic operation flow chart
Loading screen
System parameter setting screen
Password input screen
Main screen
Initial screen
Graph recording screen
Содержание SDR100E Series
Страница 19: ...17 02 Operation and setting Password input screen Screen without DI option Screen with DI option...
Страница 23: ...Main screen Part 03...
Страница 25: ...4 1 Graph recording screen 24 Graph recording setting Part 04...
Страница 36: ...5 1 Graph view 35 5 2 Data searching 36 Graph searching Part 05...
Страница 39: ...Function setting Part 06...
Страница 51: ...Part 08 Setting canned message...
Страница 53: ...Setting reserve operation Part 09...
Страница 64: ...Part 11 Error history display...
Страница 68: ...Part 12 Setting system parameter...
Страница 70: ...13 1 Sensor input screen 69 Screen for setting the sensor input Part 13...
Страница 95: ...DI function and operation Part 16...
Страница 102: ...System initial setting9 Part 18...
Страница 106: ...104 Fig 18 8 Screen setting for sending to SDR100 Upload Fig 18 9 Screen for parameter file selection to send to SDR100...