
Chapter 1 Getting Started
Verizon 4G LTE Network Extender for Enterprise User Guide VSR 1.2.6 v1.0
3
© Samsung
Personal and Product Safety
This product safety information includes U.S. directives that you must follow.
All applicable OSHA regulations and standards shall be followed.
The installation, maintenance, or removal of telecommunications equipment
requires qualified, experienced personnel. Samsung installation instructions are
written for such installation personnel.
Site Safety
Site construction shall be design-approved and certified by engineers who have
valid and up-to-date P.E. license approval with the National Society of
Professional Engineers.
Workers shall evaluate site safety as per all applicable safety ordinances and
requirements including, but not limited to OSHA, NFPA 70, and applicable
building code requirements prior to, during, and after completion. Workers shall
not conduct product work until and unless the site is in full safety compliance with
associated regulatory requirements.
Materials
Workers shall use only approved materials that comply with applicable safety and
environmental requirements. All materials shall be deployed in accordance with all
applicable safety requirements, and according to manufacturer instruction.
Workers shall not install any materials that are intrinsically unsafe, or has
shipping, handling, or installation instructions that are intrinsically unsafe.
Electrical
This product contains hazardous energy levels as defined by UL 60950. Care must
be taken as injury to personnel or damage to the equipment could result from
mistakes. Maintenance should only be carried out by approved workers who have
adequate training and understanding, and are familiar with the required procedures
and instructions.
In addition to all applicable safety requirements, workers shall abide by the latest
edition of NFPA 70 national electrical code. Certified and licensed Electricians
and Power Limited Technicians shall perform electrical work as required by
applicable regulatory requirements.
All structural materials shall be grounded, and all input and outputs shall have
built-in isolation from the network as per NFPA 70 standards and client-approved
standards. All connectivity and input and output hardware ports that connect to
external power sources shall be designed and installed to meet national safety and
regulatory requirements.