Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
7. Level 2 Repair
7-5. Assembly
※
Caution
1) Be care of coaxial cable damage
※
Caution
1) Be care of chip damage nearby screw point.
※
Caution
1) Be care of FPCB damage and tilt
2) Be care of press power/time
※
Caution
1) Be care of components FPCB.
3
4
Attach 2 coaxial cable, Screw 4point in SUB
PBA.
1)Attach components on Front.
(RCV module, Sensor FPCB, Motor and SUB PBA)
2)Attach OCTA and SUB PBA Connector
2
1
Attach EMI Tape(4), Flooding label and Main
CAM in PBA
Assembly the PBA at the front.
And attach 2 coaxial cables.