Operation Instruction & Installation
Samsung Electronics
22
On delivery, the indoor unit is loaded with an inert gas. All this gas must
therefore be purged before connecting the assembly piping. To purge the inert
gas, proceed as follows.
Unscrew the caps at the end of each pipe.
Result
: All inert gas escapes from the indoor unit.
Result
:
• To prevent dirt or foreign objects from getting into the pipes during installation,
do NOT remove the caps completely until you are ready to connect the piping.
DB98_20402A(1)_1 10/26/04 2:48 PM Page 22
Содержание MH052FDEA
Страница 106: ...MEMO 105 Samsung Electronics ...
Страница 113: ...Samsung Electronics 112 Exploded Views and Parts List 1 2 8 9 10 11 3 6 7 4 5 ...
Страница 132: ...131 Samsung Electronics 11 PCB Diagram 11 1 MAIN PCB Indoor Unit TOP ...
Страница 133: ...Samsung Electronics 132 PCB Diagram BOTTOM ...
Страница 136: ...135 Samsung Electronics 11 2 MAIN PCB Outdoor Unit 11 2 1 MH068FXEA4 MH080FXEA4 TOP ...
Страница 137: ...Samsung Electronics 136 PCB Diagram BOTTOM ...
Страница 154: ...153 Samsung Electronics MH052FPEA Schematic Diagram This Document can not be used without Samsung s authorization ...
Страница 156: ...155 Samsung Electronics Schematic Diagram This Document can not be used without Samsung s authorization MH052FDEA ...